PMP 400/430 and PTP 200/230 Series Configuration and User Guide
pmp-0042 (March 2014)
Page 7 of 98
List of Procedures
Procedure 1: Reporting Problems ................................................................................................................. 12
Procedure 2: Finding collocation values using Frame Calculators ................................................................ 49
Procedure 3: Assembling a 5.8 or 5.4 GHz AP, and attaching to tower ........................................................ 78
Procedure 4: Assembling a 4.9 GHz AP, and attaching to tower .................................................................. 80
Procedure 5: Cabling and Grounding/Earthing the AP .................................................................................. 83