ROOM UNIT WATER LEVELS FOR
PAC6500AX
The water system in the room unit will be to
the correct level when delivered.
However if for some reason the level has
fallen, antifreeze (33%) and water will have
to be added. The header tank filler and level
indication is located to the rear of the room
unit and can be accessed by removing the
two screws holding the security plate over
the filler tank cap, see Fig 2.
Ensure the machine is running in cooling
mode before removing the header tank
cap, and as with all pressure caps,
remove slowly.
It is recommended that a
mixture, by volume, of one part antifreeze
to
two parts
water is utilised, this will prevent
freezing down to an external temperature
of -20°C/-5°F). The approximate total
volume of the PAC system complete with
heat exchanger and lines is shown below.
SYSTEM CAPACITIES
6.0kW UNITS
5m Lines
7·4 Litres/1·63 Galls.
10m Lines
8·8 Litres/1·94 Galls.
15m Lines
10·3 Litres/2·27 Galls.
20m Lines
11·7 Litres/2·57 Galls
25m Lines
13·1 Litres/2·88 Galls.
30m Lines
14·5 Litres/3·18 Galls.
LINESET LENGTH
DO NOT APPLY MAINS WATER PRESSURE TO THE SYSTEM
GAS CHARGE
The dehumidifier incorporates a hermetically sealed refeigeration circuit containing less
than 6kg of refrigerant. R407c Global warming potential (GWP) 1774.
HIGH
LOW
PAC15AX/PAC22AX
FILLER CAP
PAC22AX
FIG 2
Содержание PORTATEMP 6500AX MKIII
Страница 2: ...Page 2...
Страница 14: ...Page 14...
Страница 17: ...Page 17 BOUCHON DE REMPLISSAGE PORTATEMP 6500 FIG 2...
Страница 24: ...Page 24...