background image

Page 12

Page 13

De-scale

To gain access to internal components, the body lid must be 
removed. The lid incorporates a condenser mechanism 

which 

must 

be fitted the correct way round. The lid is labelled accordingly. To 

remove the lid, break the lid gasket seal and pull the lid forward and up, 
to the front of the machine before lifting it clear of the body.

Note

: Whenever the body lid has been removed from the boiler  a new 

lid gasket may be required to ensure a steam-tight joint. Damage to the 
unit caused by a poor lid seal is not covered by warranty.

Scale deposits should be removed from all internal surfaces, 
particularly the heating element, thermistor and level sensors by gently 
tapping or scraping. If the deposits are soft, use a nylon pad and flush 
out. Abrasive cleaning materials containing scouring powders and 
detergents must not be used, such materials can cause taste problems.

Suitable chemical de-scalants must only be used in accordance with  
the manufacturers recommendations. This will prevent health and 
safety issues, taste problems and potential damage to the appliance. 
All trace of these chemicals must be removed from the appliance 
before re-commissioning the unit . Misuse of such chemicals is not 
covered by the product warranty.

IMPORTANT Before re-commissioning the boiler it is important 
that all scale and moisture is removed from the level sensor 
insulating gaskets, to avoid a false signal being transmitted 
through the scale to the boiler body. Failure to remove this 
scale and/or moisture could cause the sensor to indicate to the 
PCB that water is covering the element, whether or not water 
is present. In this situation the PCB could energise the element 
causing failure. If in doubt, protect the element by hand filling 
with water to the level of the draw-off tap before switching on the 
electrical supply to the boiler.

General function

The printed circuit board (PCB) controls the heating and filling functions 
of the boiler by monitoring the thermistor and level sensors. The PCB 
also controls the external light unit to indicate the current state of the 
boiler. Red and yellow LED’S on the circuit board indicate whether the 
PCB has energised the element or solenoid respectively.

Should an element fail and need to be replaced, it may be necessary 
to replace the lid gasket to ensure a reliable steam-seal.

 Note: the 

element has a permanent ‘Live’ feed, and the ‘Neutral’ is switched.

Printed Circuit Board replacement (PCB)

In the event of a PCB failing and a replacement being required, full 
instructions will be supplied. It is important to note however, that the  
Triac PCB must be securely mounted against the copper heat-sink 
to ensure reliable heat dissipation. Heat transfer compound is also  
supplied with all replacement circuit boards.

Adjusting the Water Temperature Set Point 

The temperature potentiometer (Pot) is pre-set at Calomax and 
will only require adjustment in exceptional circumstances. Contact 
Calomax for advice.

Water boils at different temperatures depending on barometric 
pressure. The temperature should not be tuned higher than 98°C, or 
over boiling  may occur during low barometric pressure conditions, 
causing the unit to trip the overheat cut-out device.

On / Off Switch

The On / Off switch is positioned at the rearof the machine. When in 
the off position the unit will cease to function & the light on the fascia 
will go out. 
NOTE: This switch must not be used to isolate the electrical supply 
for servicing / maintenance. When maintaining / servicing the unit the 
power cord must be removed from the mains supply.

Содержание CASCADE-4

Страница 1: ...N AND SERVICING INSTRUCTIONS Calomax Limited Lupton Avenue Leeds LS9 7DD Tel 0113 249 6681 Fax 0113 235 0358 e mail service calomax co uk www calomax co uk Please read these instructions carefully bef...

Страница 2: ...CLEANING 8 SERVICE INSTRUCTIONS 9 12 13 EXPLODED DIAGRAM 10 11 SPARE PARTS 14 15 ACCESSORIES 16 WIRING DIAGRAM 17 TROUBLE SHOOTING 18 WARRANTY 19 PRODUCT SPECIFICATION 20 CHECK LIST Before commencing...

Страница 3: ...TING THE SUPPLY PIPE MUST BE THOROUGHLY FLUSHED OUT TO ENSURE THAT FOREIGN MATTER DOES NOT BLOCK OR ENTER THE SOLENOID VALVE The boiler must be connected to a potable water supply using the food grade...

Страница 4: ...id orange indicating that the boiler is full and up to temperature Subsequent Use After the boiler has finished the commissioning cycle and water is drawn from the tap water will be replaced in short...

Страница 5: ...of the boiler is showing solid colour the machine has been starved of water for in excess of 20 minutes and the solenoid valve has been disabled to prevent damage to the solenoid coil through overheat...

Страница 6: ...apper not shown for clarity 15 9 10 14 3 2 4 5 6 8 12 If parts required are not identified please contact Calomax Limited 1 Includes nuts washers etc Exploded parts view Cascade 4 To be read in conjun...

Страница 7: ...element causing failure If in doubt protect the element by hand filling with water to the level of the draw off tap before switching on the electrical supply to the boiler General function The printe...

Страница 8: ...P BODY PRINTED CIRCUIT BOARD Inc TRIAC LIGHT PCB ELEMENT 3kW THERMISTOR ASSEMBLY KIT SOLENOID VALVE BODY LID GASKET WATER INLET HOSE MANUAL RESET THERMAL CUTOUT LEVEL PROBES KIT BODY LID GROMMET 1 2 3...

Страница 9: ...BLACK BLUE PINK BROWN ORANGE WHITE BLACK RED YELLOW WHITE BLACK BLACK RED N L BLUE BLUE L N BLACK YELLOW GREEN YELLOW GREEN RED RED COLD WATER INLET SOLENOID VALVE ELEMENT TRIAC PCB HIGH NORMAL LOW L...

Страница 10: ...place P C B BASIC TROUBLE SHOOTING Calomax have manufactured water boilers in the UK for over 50 years We are proud of our products and the back up service we provide Properly maintained and serviced...

Страница 11: ...Average Flow rate from tap Stan dard nozzle 2 5 Litres Minute Voltage 220 240 V ac 50 60 Hz Power rating 3kW MAX PLEASE ENTER SERIAL NUMBER FOR FUTURE REFERENCE PLEASECONTACTOURSERVICEDEPARTMENTFORAS...

Отзывы: