Site Preparation
Before you install any BLAST device, you need to consider the routing of the power adapter
cord and Ethernet cable(s) if used.
Note:
It is critical that you maintain the proper airflow in and around the unit. These devices
are designed for surface mounting only. Do not install cabinetry or other building material
around the outside of the unit.
Power Cords
In order to complete the installation, a power cords is required:
Connectorized Power and Signal Cable - A 2-pin barrel connector to the local AC
power receptacle (Type A).
Coaxial Cables
Note that Coaxial cable connections are to be internal connections only. Outdoor
connections are not allowed.
Before you Begin
Before starting the installation process, check that the following conditions are met:
Ensure the site preparation steps are complete based on the model being installed.
Ensure that all components are on-site or readily available to complete the installation.
The customer is aware of your planned visit and will provide access to the inside of the
home.
Содержание GigaSpire BLAST u6me
Страница 1: ...GigaSpire Mesh BLAST u6me Installation Guide January 2022 Part 220 01228 10 ...
Страница 2: ......
Страница 7: ...7 Proprietary Information Not for use or disclosure except by written agreement with Calix ...
Страница 17: ...17 Proprietary Information Not for use or disclosure except by written agreement with Calix ...
Страница 25: ...25 Proprietary Information Not for use or disclosure except by written agreement with Calix ...
Страница 26: ......
Страница 29: ...29 Proprietary Information Not for use or disclosure except by written agreement with Calix ...