background image

Step 4: Open Position 

Installation

7

Open Direction

Choose whether your gate opens left or right.

Dip Switch #6 (Figure 10) on the bottom of the gate operator circuit board 

controls the open direction. 

On = opens right, Off = opens left

Figure 10

Step 5: Installing the Photo Eye

1. Plug the photo eye cable to the back of the gate opener,

behind the circuit board, 

F

igure 1

1

2. Press the reset button on the gate operator control board.

3. Mount the photo eye on the stationary part of your gate or a post next

to your gate, about 21" from the ground.

4. Press the orange button on the photo eye to turn on the infrared beam.

5. Mount the reflector to the opposite side. Make sure the infrared beam hits
inside the circle of the reflector. Figure 1

2

6. Press the orange button on the photo eye to turn off the infrared beam.

Plug photo eye 

cable here

Figure 1

1

Figure 1

2

Infrared beam
inside circle

Youtube 

Youtube video with more details on how to install the photo eye: https://youtu.be/F7NpB9W_OMY

Содержание CM6-ACFP

Страница 1: ...CM6 ACFP Instruction Manual www calimetco com 9949 Hayward Way South El Monte CA 91733 Tel 626 452 9009 Swing Gate Operator...

Страница 2: ...roperly maintained Read the owner s manual on how to maintain your gate Have a certified service technician make repairs or install gate operator hardware The gate entrance should be used for vehicles...

Страница 3: ...e 2 Wedge Anchor Step 1 Installing the Base The base also known as a pad is a raised platform We recommend using a concrete base 1 2 x 3 1 2 2 Contact local underground utility locating companies befo...

Страница 4: ...positions weld gate bracket and arm Figure 4 A Should be at least 1 4 the gate length NOTE Uphill or heavy gates should be at least 1 3 gate length B C 14 minimum for open gate clearance 2 thick gate...

Страница 5: ...h stress is put on the arm in this position during gate operation Figure 6 A Preferred arm position is 90 from the open gate B Distance between door and machine 2 min Installation Figure 5 C 4 NOTE If...

Страница 6: ...Figure 7 Support bar should be installed at the gate bracket height across the entire gate to keep the gate pickets from bending Installation 5...

Страница 7: ...nimum capacity for 15 amp current 2 All operators MUST be properly grounded in order to prevent an electrical charge Must use a dedicated circuit for power supply 3 When the power is connected turn op...

Страница 8: ...on the gate operator control board 3 Mount the photo eye on the stationary part of your gate or a post next to your gate about 21 from the ground 4 Press the orange button on the photo eye to turn on...

Страница 9: ...eft or right on both limit cams to adjust the position of where the gate opens and closes Figure 9 TIP Use the OPEN CLOSE STOP buttons on the gate operator circuit board for faster testing 3 Use the s...

Страница 10: ...eset the pedal only when the operator doesn t work while using the remote control 1 Push the pedal downward from locked position and slightly move to the left 2 Allow the pedal rise up to the reset po...

Страница 11: ...Figure 15 Features Safety and Exit Loop This is an optional step If you wish to install a exit loop detector see figure 15 for the position of the safety and exit loops Entrapment Protection 10...

Страница 12: ...e bottom of the circuit board with the words DATA and DATA B Use a flathead screwdriver to release the 2 locks on the top of the green terminal C For conductor 1 connect the DATA on the MASTER circuit...

Страница 13: ...Figure 16 Features Control Board Layout This is a picture of the control board Use this for reference Youtube Circuit board Programming Guide https youtu be _7iBuKr1ZtY 12...

Страница 14: ...on B Unscrew the back of the remote control to gain access to the control board You should see 1 8 dip switches Each switch has 3 positions up middle bottom Flip these 1 8 switches to any position you...

Страница 15: ...ect gate movement whenever gate is moving in any direction Use first signal to stop gate use second signal to move gate to opposite direction 4 1 PASS Anti tailgating system It corresponds to undergro...

Страница 16: ...Figure 20 15 Features External Receiver External connectors are installed on the rear side of mainboard protector box...

Страница 17: ...ircuit board Figure 22 left 3 Test device sensitivity every 6 months Sensitivity The sensitivity has to do with the weight of the gate and also other factors A heavier gate will require less sensitivi...

Страница 18: ...9949 Hayward Way South El Monte CA 91733 Tel 626 452 9009 Alternate 626 482 3066 Fax 626 452 9010 Email info calimetco com www calimetco com...

Отзывы: