INSTALLATION INSTRUCTIONS
Mounting (Mounting Bracket Assembly) 1 of 2
Ceiling Line
Mount Wall Trim
Projected Location of
Hard Ceiling Drywall
Ceiling Line
5/8” Drywall
Wall Stud
6-1/4”
Hang luminaire
on Wall Trim
Hold in place
Ceiling Line
4”
Hex Nut
Lock Washer
Hex Head Bolt
Slide Mounting Brackets
onto Luminaire
Each Mounting Bracket secures
the luminaire to the Wall Trim
Determine number of Mounting Brackets required.
Note:
Refer to the diagrams on page 15 as a guide.
4
If applicable, assemble Mounting Brackets. Insert Hex Head Bolts through holes,
then place Lock Washer and Hex Nut on bolts. Leave the assembly loose for now.
5
Hang luminaire from mounted Wall Trim and hold in place. Have another person
slide Mounting Brackets onto luminaire and Wall Trim. Tighten bracket nuts
slightly so the bracket securely holds the luminaire in place. Do not tighten nuts
completely at this time.
6
Hang or cut drywall along installation area so it is exactly 4” above ceiling line.
Note:
Drywallers must hang drywall to the specifications. Only cut if necessary.
2
Mark locations along Wall Trim extrusion where it will be mounted to wall studs,
then drill holes as needed and mount to wall studs.
Note:
Mount Wall Trim extrusion using at least 1 screw per 2’, rounded up.
3
Install concealed ceiling system grid. Assemble the grid so there is a continuous
6-1/4” opening where luminaires will be installed. The installation area must
have at least 10” of overhead space from ceiling line.
Note:
Do not hang ceiling drywall before luminaires are installed. Luminaires
must be mounted prior to installation of ceiling drywall to allow top access.