17
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
POWER
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
T-STAT 4
C
R
W
T
T COM
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
AUX
6 Zone
ZSR106
MASTER
PRIORITY ON
REMOTE ENABLE ON
EXERCISE ON
POST PURGE ZONE#1 ON
SLAVE
OFF
OFF
OFF
OFF
REMOTE ENABLE
24 - 120 VAC
L
N
O
N
O
F
F
STATUS
DURING
PRIORITY
Maintenance and Repair
: The Caleffi Z-one™ multi-zone pump control
comes with two spare fuses. If control fails or is damaged, replace control with
functional one.
Boiler connections
:
XX
= Dry contact rated up to 120 VAC, 2 Amps,
which is typically connected to TT on boiler control,
closes when any zone calls including priority.
ZONE 1 E/S
= Dry contact rated up to 120 VAC, 2
Amps, will close with any call to ZONE 1. Zone 1 can
be enabled as a priority zone, typically used for heating domestic hot water. The
ZONE 1 E/S can be used to close a DHW contact on boiler controls equipped
with these features.
AUX
= Dry contact, rated up to 120 VAC, 2 Amps, close
when any zone calls and can be used
as signal to a variable speed self
regulated pump or other controls.
Communication connections:
Connect terminals to matching terminal of slave boards
D to D, P to P, Ground to Ground. Use 18 gauge
thermostat wire and it should be shielded if located in
close proximity to high voltage wiring.
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
POWER
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
T-STAT 2
C
R
W
T
T
COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T
T
COM
T-STAT 1
C
R
W
T
T
COM
T-STAT 4
C
R
W
T
T
COM
T-STAT 5
C
R
W
T
T
COM
T-STAT 6
C
R
W
T
T
COM
AUX
6 Zone
ZSR106
MASTER
PRIORITY ON
REMOTE ENABLE ON
EXERCISE ON
POST PURGE ZONE#1 ON
SLAVE
OFF
OFF
OFF
OFF
REMOTE ENABLE
24 - 120 VAC
L
N
O
N
O
F
F
STATUS
DURING
PRIORITY
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
POWER
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
T-STAT 4
C
R
W
T
T COM
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
AUX
6 Zone
ZSR106
MASTER
PRIORITY ON
REMOTE ENABLE ON
EXERCISE ON
POST PURGE ZONE#1 ON
SLAVE
OFF
OFF
OFF
OFF
REMOTE ENABLE
24 - 120 VAC
L
N
O
N
O
F
F
STATUS
DURING
PRIORITY
Input Power
:
L = Line (hot leg) of 120 VAC supply
N = Neutral of 120 VAC
= Ground
Note: when connecting 2 or more Z-one
controls, all controls must be powered by the same 120 VAC circuit.
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
POWER
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
T-STAT 4
C
R
W
T
T COM
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
AUX
6 Zone
ZSR106
MASTER
PRIORITY ON
REMOTE ENABLE ON
EXERCISE ON
POST PURGE ZONE#1 ON
SLAVE
OFF
OFF
OFF
OFF
REMOTE ENABLE
24 - 120 VAC
L
N
O
N
O
F
F
STATUS
DURING
PRIORITY
Zone pump outputs
:
Zone pumps run when
corresponding thermostat
initiates a demand.
GROUND = Connect the
ground from the pump to the
ground terminal. PRIORITY PUMP = Runs when zone #1 calls. Can be
programmed to be the priority zone. L = Line (hot leg) of 120 VAC to power
the pump, N = Neutral leg of 120 VAC to power the pump.
Remote Enable
allows for input of 24-120 VAC from a boiler to allow the zone pumps to
operate. When power is removed from Remote Enable, zone pumps will
not be allowed to operate. This is useful during warm weather shut down to
stop zone pumps from running or if your boiler controls are used to handle
priority (DHW) demand and need the zone pumps to be off during the priority
demand. Even with power removed from Remote Enable, the ZSR board
stays powered to supply power to the thermostats.
Primary pump output:
Primary pump runs when any zone pump runs. Its
status during priority (on\off) can be programmed
using the jumper pins.
L = Line (hot leg) of 120 VAC to power the pump
N = Neutral leg of 120 VAC to power the pump
Status During Priority ON / OFF:
If priority is enabled and the jumper is
placed on the ON pins, the primary pump will continue to operate during ZONE
1 demand. When jumper is placed on OFF pins, the primary pump will be OFF
during ZONE 1 demand.
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
POWER
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
T-STAT 4
C
R
W
T
T COM
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
AUX
6 Zone
ZSR106
MASTER
PRIORITY ON
REMOTE ENABLE ON
EXERCISE ON
POST PURGE ZONE#1 ON
SLAVE
OFF
OFF
OFF
OFF
REMOTE ENABLE
24 - 120 VAC
L
N
O
N
O
F
F
STATUS
DURING
PRIORITY
WARNING:
NEVER CONNECT R & C DIRECTLY, this will be a direct short on the 24 VAC
supply.
WARNING:
When connecting 2 or more Z-one controls, all controls must be powered by
the same 120 VAC circuit.
The ZSR series of control is
programmed by positioning five dip
switches for the following operations.
Master / Slave:
allows for unlimited
expansion to additional ZVR or ZSR
relays. Only one Master.
Priority ON / OFF:
When priority
switch is ON, upon demand to
TSTAT 1 , ZONE 1 will operate as priority and all other zones are temporarily
switched off (with 1 hour time-out). When priority is OFF, any zones that were
active when ZONE 1 was switched on will remain on.
Remote Enable ON / OFF:
When remote enable mode is ON, the board will
hold off all zones waiting for an external 24 - 120 VAC voltage from the boiler.
Exercise ON / OFF:
When exercise mode is ON, each circulator is switched on
for 30 seconds following 72 hours of inactivity.
Post Purge Zone #1 ON / OFF:
When post purge is ON, Zone 1 pump continues
operating for 2 minutes after the priority zone is switched OFF.
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
POWER
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
ZONE 1
E / S
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
T-STAT 4
C
R
W
T
T COM
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
AUX
6 Zone
ZSR106
MASTER
PRIORITY ON
REMOTE ENABLE ON
EXERCISE ON
POST PURGE ZONE#1 ON
SLAVE
OFF
OFF
OFF
OFF
REMOTE ENABLE
24 - 120 VAC
L
N
O
N
O
F
F
STATUS
DURING
PRIORITY
WARNING:
When replacing fuses, make sure power is disconnected to control box.
Содержание Z-one ZSR103
Страница 9: ...1 1...