background image

Having chosen the box location, proceed as in points 1-2-3-4 below.

Installation and Insulation 

Assembly Procedures - 

Model 2 + 0 and 2 + 1

Examples of location

in manifold box

Service Instructions

There is no service required for the HydroLink™ device.

Caleffi North America, Inc.

3883 West Milwaukee Road

Milwaukee, WI 53208

T: 414.238.2360 F: 414.238.2366

7-23-18

·

Installation Tip

Scan to view

5599 HydroLink™

 

 

4

Leave this manual for the user.

2.

 Mount the device to 

the internal supports 

in the manifold box.

3.

 Connect the piping, leak-

test and close the pre-formed 

insulation shell after removing 

the protection film from the 

upper surface adhesive. 

4.

 If the unit is to be used 

with chilled water, see point 

2 of the previous section.

1.

 Remove the protection film 

from the lower surface adhesive 

and position the HydroLink™ 

unit inside the insulation shell.

Отзывы: