4
Right-side version installation
1)
Install the temperature gauge and the air vent. The end fitting is
supplied with only the fill/drain cock already mounted. Unfasten
the insulation by means of the tear-off closure (a1) and make a
hole through the embossed signs on the inner side (b1).
2)
Unscrew the cap from the front connection and screw down the
pocket for the temperature gauge, tightening it to the end stop.
3)
Close the insulation and fit the air vent in the upper connection.
2)
Thread the furnished nuts onto the steel bars extending from the
end cap. Do not tighten them to the end stop since they are
used as locks to connect the manifold to the brackets.
3)
Connect the manifolds to the brackets using the quick coupling,
before mounting the brackets on the wall. If necessary the
manifolds can be connected without the insulation inserted on
the end fitting, so that the screws for connecting the manifold to
the brackets remain visible.
PRE-ASSEMBLED MANIFOLD
The pre-assembled manifold is supplied in the right-side version
but can be fitted with the main connections on the left side
depending on the heat pump position compared to the probes.
Mounting brackets - manifold
1)
Hand thread the furnished screws several turns into the rear
threads on the end fitting: do not tighten them to the end stop
since they are the anchor point between the manifold and the
brackets.
right-side version
left-side version
a1
a2
b1
B2