![Cafe C2Y366 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/cafe-0/c2y366/c2y366_installation-instructions-manual_3302535007.webp)
31-2000815 Rev. 0
7
Installation Information
TOOLS REQUIRED
MATERIALS REQUIRED (not provided)
INSTALLATION AT HIGH ALTITUDE
Over 6000ft, product configured for natural gas or
propane requires installation of kit (WB28X39728
for natural gas and WB28X39729 for propane gas) .
Follow the instructions included with the kit .
MATERIALS PROVIDED
Oven Rack
Lubricant
Runners
(to protect
flooring)
1/2” Pipe
Elbow
Anti-Tip
Bracket, Brace
and Screws
Leveling Leg
Wrench
Adjustable Wrench
1/4” Driver or Wrench
Safety Glasses
Drill and
Appropriate Bits
Measuring Tape
Phillips #2 Screwdriver
Saber Saw
Carpenter’s Square
Level
Hand Truck
Shut-Off Valve
Shut-Off Valve
Pipe Fittings
5-foot maximum length, 5/8” O.D. CSA-
approved flexible metal gas supply
NOTE:
Purchase new flexible line; do not
use previously used flexible gas line.
Pipe Thread
Sealant