11
IDROSTUFE A PELLET
Fig. 11 - Phase1
• Connect the air intake pipe to the combustion air pipe of the stove and tighten everything with a clamp (see [
Fig. 11
).
5
INSTALLATION AND ASSEMBLY
5.1
INTRODUCTION
• The assembly position must be chosen depending on environment, outlet, chimney flue.
• Check with local authorities if there are any restrictive regulations which regard the combustible air inlet, room ventilation,
fume exhaust system together with chimney flue and chimney pot.
• Check if there is the combustible air inlet.
• Check the probable presence of other stoves or appliances which could depress the room.
• Check at switched on stove if there is the presence of CO in the room.
• Check if the chimney has the necessary draught.
• Check if during the fume passage all has been executed in safety (probable fume losses and distances from flammable mate-
rials, etc.…).
• The installation of the appliance must enable an easy access for appliance, fume exhaust pipes and chimney flue cleaning.
• The installation must enable en easy access to the electric connection plug.
• To install more appliances, the external air inlet must be correctly dimensioned (see
FEATURES a pag. 48
).
5.2
PREPARATION AND UNPACKING
The product is packaged in a recyclable cardboard box according to RESY standards, on a wood pallet. All the packaging materials can
be reused for similar purposes or, in the event, disposed of as waste assimilable to urban solid waste, following the standards in force.
After having removed the packaging, make sure the product is intact.
Handle the product with appropriate means, respecting the safety standards in force. Do not overturn the
packaging and use caution for the ceramic details.
The stoves are delivered in a single package with ceramic panels or steel sides packaged along with the structure and positioned
either on top or to the side. Open the packaging, remove the cardboard and any supporting polystyrene and place the stove in the
selected location, making sure it complies with the requirements.
The stove body or single unit must always be handled upright exclusively using hand trucks. Be especially careful to protect the
door and its glass from mechanical impacts that would compromise their integrity.
If possible, unpack the stove near the area in which it will be installed.
The packaging materials are neither toxic nor harmful.
To take the stove off the pallet, remove the two “U” screws and slide the “S” plate out from the stove foot. There are four “S” brackets
(see below).
Содержание AQUOS3 16
Страница 54: ...NOTE ...
Страница 55: ...NOTE ...