
AC GENERATORS
sEctioN 2.3
trouBlEsHootiNG floWcHarts
Use the “Flow Charts” in conjunction with the detailed
instructions in Section 2.4. Test numbers used in
the flow charts correspond to the numbered tests in
Section 2.4.
The first step in using the flow charts is to correctly
identify the problem. Once that has been done, locate
the problem on the following pages. For best results,
perform all tests in the exact sequence shown in the
flow charts.
Part 2
Page 37
General
REPAIR
OR
REPLACE
REPAIR
OR
REPLACE
REPAIR
OR
REPLACE
THEN
RETEST
REPLACE
VOLTAGE
REGULATOR
TEST 1 - CHECK
MAIN CIRCUIT
BREAKER
TEST 4 - PERFORM
FIXED EXCITATION /
ROTOR AMP DRAW
PERFORM STATOR
INSULATION
RESISTANCE TEST
-
SECTION 1.4
PERFORM ROTOR
INSULATION
RESISTANCE TEST
-
SECTION 1.4
TEST 7 - TEST
STATOR
TEST 5 - WIRE
CONTINUITY
TEST 6 -
FIELD BOOST
TEST 11 -
CHECK
ROTOR
RESISTANCE
CHECK
VOM
FUSES
TEST 12 -
CHECK
BRUSHES &
SLIP RINGS
TEST 13 -
TEST ROTOR
ASSEMBLY
REPAIR
OR REPLACE
FUSES
RE-TEST
BAD
BAD
BAD
BAD
BAD
BAD
BAD
BAD
GOOD
GOOD
GOOD
GOOD
Problem 1 - Generator Produces Zero Voltage or Residual Voltage
(12-20 kW)
D
G
A
C
B
GOOD
GOOD
RESET TO
“ON”
OR REPLACE
IF BAD
0G9266revA.indd 37
10/15/2008 11:27:13 AM
Содержание FOR BYPASS AND FAN POWERED HUMIDIFIERS
Страница 56: ...Page 54 NOTES 0G9266revA indd 54 10 15 2008 11 27 21 AM...
Страница 189: ...Page 187 0G9266revA indd 187 10 15 2008 11 28 53 AM...
Страница 190: ...Page 188 0G9266revA indd 188 10 15 2008 11 28 53 AM...
Страница 191: ...0G9266revA indd 189 10 15 2008 11 28 53 AM...