Chapter 3: Installation
Page 3-6
2H22-08R SmartSwitch 2208 User’s Guide
Figure 3-4
Installing the 2H22-08R in a Rack
3.5
CONNECTING POWER TO THE 2H22-08R
To connect the 2H22-08R to the power sources, proceed as follows:
1.
Insert the connector of each power cord into the two power supplies
and insert the plug of each power cord from the 2H22-08R into a
grounded wall outlet, see
Figure 3-5
. To take advantage of the load
sharing and redundancy capabilities, each power cord must be plugged
into a dedicated ac outlet. The POWER LED turns on (green) and the
CPU LED turns on (green) briefly.
Figure 3-5
2H22-08R Rear View
NOTE
The 2H22-08R has a primary and redundant power supply.
Both power supplies have automatic voltage sensing that
allows connection to power sources ranging from 100–125 Vac,
2.0 A or 200–240 Vac, 1.0 A, 50/60 Hz.
Screws (4)
19-Inch Rack
2251-03
7
8
1X
5X
6X
4X
3X
2X
2
1
6
5
4
3
PWR
CPU
COM
RESET
2H22-08R
Primary
Redundant
2H22-08R
1960-62
Содержание 2208
Страница 2: ......
Страница 8: ...Notice vi 2H22 08R SmartSwitch 2208 User s Guide ...
Страница 24: ...Chapter 1 Introduction Page 1 12 2H22 08R SmartSwitch 2208 User s Guide ...
Страница 140: ...Appendix A Specifications Page A 4 2H22 08R SmartSwitch 2208 User s Guide ...
Страница 144: ...Appendix B FE 100TX FE 100FX and FE 100F3 Specifications Page B 4 2H22 08R SmartSwitch 2208 User s Guide ...
Страница 158: ...Index Index 4 2H22 08R User s Guide ...