Table of Contents
1. Listing and Code Approvals
.............................
A. Appliance Certification....................................
B. BTU Specifications..........................................
2. Getting Started
...................................................
A. Design and Installation Considerations...........
B. Tools and Supplies Needed............................
C. Inspect the Appliance and Components ........
D. Step by Step Lighting Instructions...................
3. Framing Clearances
A. Selecting a location ..........................................
B. Required clearance to combustibles ………….
C. Framing Enclosure for LP Gas Supply System.
4. Fuel Information
....................................................
A. Fuel....................................................................
B. Gas Pressure.....................................................
C. Gas Connection ................................................
E. LP Gas Supply...................................................
5. Appliance Setup
............................................
A. Burner Assembly.................. .....................
B. Glass Installation.........................................
6. Operating Instructions
..................................
A. Before Lighting ...........................................
B. Gas Valve Assembly……............................
C. Lighting the Fire...........................................
D. After the Fire is Lit........................................
7. Finishing
.........................................................
8. Converting to Natural Gas
.............................
9. Troubleshooting
.............................................
10. Maintaining and Servicing the Appliance
..
11. Reference Materials
......................................
A. Service Parts List.......................................
B. Contact Information....................................
C. Limited One Year Warranty .......................
What’s included…
CB-20
CB-1224
CB-1242, CB-2424
20” Round burner
Black propane hose with regulator
Flexible metal gas line
Valve Assembly
Piezoelectric igniter
(requires 1 AA battery)
#43 Orifice (LP)
#31 Orifice (NG)
2 bags of decorative glass
12”x24” burner
Black propane hose with regulator
Flexible metal gas line
Valve Assembly
Piezoelectric igniter
(requires 1 AA battery)
#43 Orifice (LP)
#31 Orifice (NG)
2 bags of decorative glass
12”x42” or 24”x24” burner
Black propane hose with regulator
Flexible metal gas line
Valve Assembly
Piezoelectric igniter
(requires 1 AA battery)
#36 Orifice (CB-2424 only- home LP)
#31 Orifice( CB-1242 only- Home LP)
#43 Orifice (20lb LP)
#17 Orifice (CB-2424 only- NG)
#21 Orifice (CB-1242 only -NG)
3bags of decorative fire glass
4
4
4
5
5
5
6
6
6
6
7
7
7
7
7
7
8
8
8
9
9
13
14
14
15
16
17
18
18
18
19
3