INSTALLATION INSTRUCTIONS
Division of LWO Corp. / P.O. Box 17125 / 3841 North Columbia Boulevard / Portland, Oregon
503-286-5372 / fax 1-503-286-4092 / www.arboria.com
PLEASE READ COMPLETELY BEFORE YOU BEGIN ASSEMBLING
CHECK CARTON FOR THESE CONTENTS
445.35.86
1 of 4
updated
04/26/05
ITEMS YOU WILL NEED
INTRODUCTION
R
Nantucket
Arbor
1). Lattice Side Frames (2)
2). Header Boards (2)
3). Rafter Boards (4)
4). Cap Boards (8)
5). Lattice Triangles (2)
Hardware
• 1” screws (4)
• 4” screws (8)
• 3/4” screws (8)
• 2 1/2” screws (28)
• Arbor Anchor Stake Kit
• Philips
screwdriver
• Power
drill/screwdriver
• Stool or short ladder
If you plan to paint:
If you wish to stain or paint your arbor we
recommend that you do so before assembly,
it makes the job easier, with better results.
Be careful not to permit paint to puddle in
grooves in the arches or upper frame, and do
not cover up guide marks on rafters.
Work area:
Select an area close to where the arbor will be fi nally placed. While the assembled unit is not very
heavy, it is awkward to move far and requires two people to do so easily.
The assembly are should be relatively fl at and open, at least 8’ x 6’. A lawn, driveway or wide path
will be satisfactory.
It is a good idea to lay out the arbor shipping box on your work surface to protect the arbor from
nicks and scratches.
(2)
(3)
(4)
(5)
(1)