![C.P.Bourg Document Finisher E Series Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/c-p-bourg/document-finisher-e-series/document-finisher-e-series_operators-manual_3123995069.webp)
Operator Manual
Page 9 - 69
Initial issue: 02/13
Latest revision: -
Weekly maintenance
1) Clean the belts, the transport wheels with a cloth and a specific cleaning solution. If you do
not do it there is a risk of smeared sheets.
2) Clean the threaded rod of the stitching heads with a brush. If you do not do it there is a risk
of not smooth movement.
Never grease the threaded rod.
3) Refer to head manual for maintenance.
- ISP M2000 : Use vaseline (CPB P/N 9142021) according to stitch head manual
(this vaseline is supplied with each new cassette).
- Hohner 43/6 S : Use grease (CPB P/N ND783959) and oil (CPB P/N 9142006) accor-
ding to stitch head manual.
Содержание Document Finisher E Series
Страница 1: ...OPERATOR MANUAL Initial issue 02 13 Latest revision 9 133 347...
Страница 5: ...Operator Manual Page 9 5 Initial issue 02 13 Latest revision This page is intentionally left blank...
Страница 21: ...Operator Manual Page 9 21 Initial issue 02 13 Latest revision...
Страница 22: ...Operator Manual Page 9 22 Initial issue 02 13 Latest revision...
Страница 23: ...Operator Manual Page 9 23 Initial issue 02 13 Latest revision...
Страница 65: ...Operator Manual Page 9 65 Initial issue 02 13 Latest revision Identification of the baffles B C D E F H I J G A...
Страница 73: ...Operator Manual Page 9 73 Initial issue 02 13 Latest revision NOTES...
Страница 74: ...Operator Manual Page 9 74 Initial issue 02 13 Latest revision NOTES...