Operator Manual
Page 9 - 68
Initial issue: 02/13
Latest revision: -
11. PREVENTIVE MAINTENANCE
For the BDF-e:
Switch off the machine.
Open the upper cover and the doors.
Daily maintenance
1) Remove the metal parts (stitches) from clinchers by pushing on the handle 3 times.
If you do not do it, there is a risk of poor stitching or jam.
2) Empty the waste bin. If you do not do it, there is a risk of machine stop with the error mes-
sage “waste bin full”. Lift up to pull out the bin.
Содержание Document Finisher E Series
Страница 1: ...OPERATOR MANUAL Initial issue 02 13 Latest revision 9 133 347...
Страница 5: ...Operator Manual Page 9 5 Initial issue 02 13 Latest revision This page is intentionally left blank...
Страница 21: ...Operator Manual Page 9 21 Initial issue 02 13 Latest revision...
Страница 22: ...Operator Manual Page 9 22 Initial issue 02 13 Latest revision...
Страница 23: ...Operator Manual Page 9 23 Initial issue 02 13 Latest revision...
Страница 65: ...Operator Manual Page 9 65 Initial issue 02 13 Latest revision Identification of the baffles B C D E F H I J G A...
Страница 73: ...Operator Manual Page 9 73 Initial issue 02 13 Latest revision NOTES...
Страница 74: ...Operator Manual Page 9 74 Initial issue 02 13 Latest revision NOTES...