background image

 

      BYD  COMPANY  LIMITED                                   

Document 

Installation Manual and User Manual for BYD 

Project    No. 

Code 

2M SOP0007540 

Edition 

13 

Page 

2 / 19 

 

CONTENT 

Foreword

 .................................................................................................................................................................................................................................................... 3

 

1. Product identification

 .......................................................................................................................................................................................................................... 3

 

1.1 Label

 .............................................................................................................................................................................................................................................................. 3

 

1.2 Barcode

 ......................................................................................................................................................................................................................................................... 3

 

2. Transportation and storage manual

 ................................................................................................................................................................................................. 4

 

3. Installation

 ............................................................................................................................................................................................................................................. 4

 

3.1 Warning

 ......................................................................................................................................................................................................................................................... 4

 

3.2 Mechanical installation

 ............................................................................................................................................................................................................................... 6

 

3.2.1 Mounting system

 .................................................................................................................................................................................................................................. 6

 

3.2.2 Clamping

 ............................................................................................................................................................................................................................................... 8

 

3.2.3 Insertion system

 ................................................................................................................................................................................................................................. 10

 

3.3 Electric installation

..................................................................................................................................................................................................................................... 12

 

3.3.1 Grounding

............................................................................................................................................................................................................................................ 12

 

3.3.2 General Installation

 ............................................................................................................................................................................................................................ 13

 

4. Maintenance and Care

 ....................................................................................................................................................................................................................... 16

 

4.1General Maintenance

................................................................................................................................................................................................................................. 16

 

4.2 Module Cleaning

 ........................................................................................................................................................................................................................................ 16

 

 

5

Claim

 ................................................................................................................................................................................................................................................... 18 

 

Содержание P6K Series

Страница 1: ...ode 2M SOP0007540 Edition 13 Page 3 22 3 Installation Manual and User Manual for BYD Photovoltaic Modules BYD COMPANY LIMITED ADD No 1 Yan an Road Kuichong Dapeng New District 518119 Shenzhen Guangdon...

Страница 2: ...5 1 1 Label 5 1 2 Barcode 5 2 Transportation and storage manual 6 3 Installation and storge 6 3 1 Warning 6 3 2 Mechanical installation 8 3 2 1 Mounting system 8 3 2 2 Clamping 11 3 2 3 Insertion syst...

Страница 3: ...ual which show 2 or 3 bus bar cell PV modules are only used for reference purposes 1 Product identification 1 1 Label The label shows the product type rated power rated current rated voltage open circ...

Страница 4: ...ather durable and able to withstand pressure the glass might break and the module will no longer work properly if it is dropped or hit by tools or other heavy objects 4 Under certain conditions the mo...

Страница 5: ...on a roof top the roof top should be made fire resistant first Do not use modules near equipment or in places where flammable gases may be generated 15 In case of roof top installation the PV array s...

Страница 6: ...efore direct contact should be avoided after installing a greater number of modules in series or parallel in order to avoid electric shocks CAUTION Please unpack the module in an appropriate environme...

Страница 7: ...FIG 3 PHL series models FIG 4 PHK series models 5 TAB 1 The size of each code measure L W T A B C Model BYDxxxP6C K 18 1482 676 50 40 35 626 628 802 482 566 BYDxxxM6C K 18 BYDxxxP6C K 24 1325 992 50...

Страница 8: ...oltage of half cell transverse module TAB 2 The size of each code measure D H Model Mechanical load test Front Mechanical load test Back BYDxxxP6C K 36 400 950 2400Pa 2400Pa BYDxxxM6C K 36 BYDxxxPHC K...

Страница 9: ...Spring Stainless Washer 5 HEX Stainless Nut 3 2 2 Clamping For clamping of the modules clamps can be used as in the figure below while the clamps must be strong enough to fasten the modules the use o...

Страница 10: ...50 BYDxxxP6C K 36 L 1956 328 250 BYDxxxM6C K 36 L 1956 BYDxxxP6C K 36 L 1962 331 250 BYDxxxM6C K 36 L 1962 BYDxxxPHC K 36 L 1992 346 250 BYDxxxMHC K 36 L 1992 BYDxxxPHC K 36 L 1978 339 250 BYDxxxMHC K...

Страница 11: ...s 3 2 3 Insertion system For the modules to follow an insertion system as depicted below can be used for installation The insertion system must have enough strength to fix modules and can be made of m...

Страница 12: ...f the half cell intermediate outgoing module is recommended the long edge to be parallel the ground The installation mode of the half cell long edge outgoing module is recommended the short edge to be...

Страница 13: ...ule frames should be prepared for grounding It is not recommended to use modules with different configurations grounding wiring in the same system The connecting areas between the materials of the fra...

Страница 14: ...ode of the inverter should be grounded CAUTION BYD modules provide the mounting holes drain holes and grounding holes That has passed the safety testing Installers can t drill and block drain holes at...

Страница 15: ...According to the system voltage 1500V of the IEC standard Under normal conditions a PV module is likely to experience conditions that produce more current voltage than reported at STC Accordingly Isc...

Страница 16: ...he cross section of the cables and the capacity of the connectors must be selected to suit the maximum system short circuit current Please note that the upper limit temperature of cable is 90 C and th...

Страница 17: ...e equipment for loss of function and change them immediately if necessary 3 Check cables connectors and joints for current leakages and deal with it in order to prevent leakage currents caused by rain...

Страница 18: ...wipe but avoid using hard material to prevent destroy glass surface Use cleaning effect to judge whether clean or not 2 Washing Clean 1 To the inorganic compound like wet dust which are not easy to cl...

Страница 19: ...causing injury It is necessary to prohibit the emergence of hook belt threads and other components that are easy to cause obstruction in clothing or tools 3 It is forbidden to tread PV modules guide r...

Страница 20: ...ace and environment BYD reserves the right to change the manuals PV products specifications and product information sheets without prior notice NOTE A note provides information about installation oper...

Страница 21: ...Project No Code 2M SOP0007540 Edition 13 Page 1 19 1 Installation Manual and User Manual for BYD Photovoltaic Modules BYD COMPANY LIMITED ADD Yan An Road Kuichong Longgang 518119 Shenzhen PEOPLE S RE...

Страница 22: ...ation 3 1 1 Label 3 1 2 Barcode 3 2 Transportation and storage manual 4 3 Installation 4 3 1 Warning 4 3 2 Mechanical installation 6 3 2 1 Mounting system 6 3 2 2 Clamping 8 3 2 3 Insertion system 10...

Страница 23: ...ntification 1 1 Label The label shows the product type rated power rated current rated voltage open circuit voltage short circuit current weight dimensions etc 1 2 Barcode Each module has only one bar...

Страница 24: ...certain conditions the module might produce a higher electric current and or voltage than measured under standard test conditions Accordingly the values of Isc and Voc marked on this module should be...

Страница 25: ...flammable gases may be generated 15 In case of roof top installation the PV array should fulfill the requirements regarding fire resistance of the norm IEC 61730 2 16 The ambient temperature range at...

Страница 26: ...d be avoided after installing a greater number of modules in series or parallel in order to avoid electric shocks CAUTION Please unpack the module in an appropriate environment and use special tools T...

Страница 27: ...35 942 860 1360 BYDxxxMHK 30 BYDxxxP6K 36 1956 992 50 40 35 942 800 1300 BYDxxxM6K 36 BYDxxxP6K 36 1962 992 45 40 35 942 800 1300 BYDxxxM6K 36 BYDxxxPHK 36 1992 992 50 40 35 942 800 1300 BYDxxxMHK 36...

Страница 28: ...ber of mounting holes for each series of components Model measure n Model measure n BYDxxxP6C K 18 4 BYDxxxP6C K 36 8 BYDxxxM6C K 18 BYDxxxM6C K 36 BYDxxxP6C K 24 8 BYDxxxPHC K 36 BYDxxxP6C K 27 BYDxx...

Страница 29: ...0 L 1640 140 250 BYDxxxM6C K 30 L 1640 BYDxxxP6C K 30 L 1650 145 250 BYDxxxM6C K 30 L 1645 142 5 250 BYDxxxP6C K 30 L 1645 BYDxxxPHC K 30 L 1669 158 250 BYDxxxMHC K 30 L 1669 BYDxxxPHC K 30 L 1658 149...

Страница 30: ...c diagram of four clamps under pressure of 1600Pa IEC61215 2016 safety factor 1 5 Installation method FIG 9 Schematic diagram of short side pressing block Notice If customer choose Installation method...

Страница 31: ...the cells on the front side and that the grounding holes on the back side don t get covered Please refer to the detailed illustration below for installation on the long side of the frame FIG 12 Guide...

Страница 32: ...ith load bearing installation requirements X indicates that the load bearing installation requirements are not met 3 3 Electric installation 3 3 1 Grounding 1 Grounding For safety reason all module fr...

Страница 33: ...o avoid potential induced degradation PID BYD insists that the negative electrode of the inverter should be grounded CAUTION BYD modules provide the mounting holes drain holes and grounding holes That...

Страница 34: ...onductor or connections is prevented The pictures are as below According to the system voltage 1500V of the IEC standard Under normal conditions a PV module is likely to experience conditions that pro...

Страница 35: ...he fuse protection needs to be determined as well 5 To prevent the cables and the connectors from overheating the cross section of the cables and the capacity of the connectors must be selected to sui...

Страница 36: ...he designated requirement If connections are not fast fasten them by soldering After a thunderstorm or before the start of the stormy season check the convergence box and the lightning protection syst...

Страница 37: ...like dry dust leaves on the PV module surface cleaner can use dry and professional mop or soft cloth to clean 2 To the attachment which are not easy to clean like mud birds droppings sticky stuff on...

Страница 38: ...modules frame support tempering glass surface to eliminate leakage potential ensure personal safety 2 There are many sharp corner on modules frame and support cleaner should wear appropriate protectiv...

Страница 39: ...manual provides reference only and consumers are free to choose an appropriate way of installation according to place and environment BYD reserves the right to change the manuals PV products specific...

Отзывы: