32
Copyright© BYD Europe B.V. all rights reserved.
•
Connecting the “S1N TO QL1
-
2” Cable to QLI2 port.
. Screw and torque with 18Nm and
draw a mark with marker
•
Connecting the “S2N TO BATT
-
” Cable to Batt
- port. Screw and torque with 18Nm and draw
a mark
Figure27 Line Arranging-4
S1N TO QL1-2
S2N TO BATT-
Содержание Battery-Box C130
Страница 1: ...English Version1 1 Battery Box C130 Installation Manual ...
Страница 14: ...11 Copyright BYD Europe B V all rights reserved Figure1 Installation Space ...
Страница 27: ...24 Copyright BYD Europe B V all rights reserved Figure14 Figure10 1 Figure11 2 Figure12 3 Figure13 4 ...
Страница 41: ...38 Copyright BYD Europe B V all rights reserved Figure42 Figure43 ...