OPERATION
MPG PLUGGER 09/20
Operation Section 4-19
O
PE
R
AT
IO
N
© 2020 Alamo Group Inc.
12.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through.
OPS-U- 0024
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the
proper equipment required. Using adequately sized
chains, heavy duty straps, cables and/or binders,
securely tie down both the front and rear of the
tractor utilizing the proper tie down locations as
specified by the tractor manufacturer.
OPS-U- 0025
Arrange the chains so that when tightened, the
chains are pulling downward and against
themselves. Carefully tighten the securing chains or
other fasteners using boomers or binders to apply
maximum tension. Use extreme care when attaching
and removing the securing devices as the extreme
tension involved when released has the potential to
inflict serious injury.
While hauling the tractor and implement, make
occasional stops to check that the tractor and
implement have not moved or shifted and that the
securing chains have maintained tension. If during
transport a hard braking, sharp turning, or swerving
action was performed, stop at the next safe location
to inspect the security of the load.
OPS-U- 0026
Содержание TOUGH MPG-600
Страница 4: ...LUBRICATION INFORMATION 5 2 SPOONS 5 3 STORAGE 5 3 PROPER TORQUE FOR FASTENERS 5 3 ...
Страница 5: ...Safety Section 1 1 SAFETY SECTION ...
Страница 17: ...SAFETY MPG PLUGGER 09 20 Safety Section 1 13 SAFETY 2020 Alamo Group Inc Decal Description ...
Страница 19: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Страница 24: ......
Страница 25: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Страница 27: ...Operation Section 4 1 OPERATION SECTION ...
Страница 47: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Страница 50: ...MAINTENANCE MPG PLUGGER 09 20 Maintenance Section 5 4 MAINTENANCE 2020 Alamo Group Inc ...
Страница 52: ...MPG 600 MPG 720 PLUGGER 09 20 P N50037571 Printed U S A MPG 600 AND MPG 720 PLUGGER ...