Commissioning | 7
Instruction Manual R5 RA 0025-0100 F_EN_en
17 | 36
●
Close the isolation valve* and open the gas ballast valve** (GB)
●
Warm up the machine
●
Wait 30 minutes
●
Open the isolation valve* and perform the process
●
Close the isolation valve*
●
Wait 30 minutes
●
Close the gas ballast valve** (GB)
END
* not included in the scope of delivery
** may be considered as optional on certain products