6 | Commissioning
14 / 28
0870569784_RA_RC1000-1600B_-0003_IM_en
5.5.5 Wiring Diagram Pressure Transmitter (Optional)
Part no.:
0653 563 751
Connector:
M12x1, 4-pin
U = 10 ... 35 VDC
4 ... 20 mA
►
0.1 ... 1 bar
1
2
4
3
3
1
+
-
1 = Brown ; 3 = Blue
Warning signal:
P
warning
= 0.4 bar (overpressure)
Trip signal:
P
trip
= 0.6 bar (overpressure)
6
Commissioning
NOTICE
The machine is shipped without oil.
Operation without oil will ruin the machine in short time!
• Prior to commissioning, the machine must be filled with oil, see
Filling Oil [
}
11]
.
CAUTION
During operation the surface of the machine may reach temperatures of more than
70°C.
Risk of burns!
• Avoid contact with the machine during and directly after operation.
CAUTION
Noise of running machine.
Risk of damage to hearing!
If persons are present in the vicinity of a non noise insulated machine over extended
periods:
• Make sure that ear protection is being used.
• Make sure that the installation conditions (see
Installation Conditions [
}
8]
) are com-
plied with.
• Switch on the machine.
• Make sure that the maximum permissible number of starts does not exceed 12 starts
per hour.
Version with water-oil heat exchanger:
• Open the water supply.
• After few minutes of operation, check the oil level and top up if necessary.
As soon as the machine is operated under normal operating conditions:
• Measure the motor current and record it as reference for future maintenance and
troubleshooting work.
6.1 Conveying Condensable Vapours
Water vapour within the gas flow is tolerated within certain limits. The conveyance of
other vapours shall be agreed upon with Busch.
All manuals and user guides at all-guides.com