Table of Contents
2 / 40
0870201062_RA1000-1600B_Ex_-0007_IM_en
Table of Contents
2.1 Operating Principle .......................................................................................................... 6
2.2 Application....................................................................................................................... 6
2.3 Start Controls ................................................................................................................... 7
2.4 Accessories ....................................................................................................................... 7
2.4.1 Gas Ballast Valve ................................................................................................... 7
2.4.2 Inlet Filter .............................................................................................................. 7
2.4.3 Water-oil Heat Exchanger ..................................................................................... 7
2.4.4 Temperature Switch .............................................................................................. 7
2.4.5 Resistance Thermometer ....................................................................................... 7
2.4.6 Level Switch .......................................................................................................... 7
2.4.7 Pressure Switch ..................................................................................................... 7
2.4.8 Pressure Transmitter .............................................................................................. 8
2.6.1 ATEX Classifications and Associated Accessories .................................................... 8
2.6.2 P&ID "Piping and Instrumentation Diagram" ........................................................ 9
5.1 Installation Conditions ...................................................................................................... 11
5.2 Connecting Lines / Pipes .................................................................................................. 12
5.2.1 Suction Connection ............................................................................................... 13
5.2.2 Discharge Connection ........................................................................................... 13
5.2.3 Cooling Water Connection (Optional) ................................................................... 14
5.3 Earth Connection ............................................................................................................. 15
5.4 Filling Oil.......................................................................................................................... 16
5.5 Fitting the Coupling ......................................................................................................... 17
5.6 Electrical Connection ........................................................................................................ 18
5.7.1 Wiring Diagram Temperature Switch ..................................................................... 20
5.7.2 Wiring Diagram Resistance Thermometer .............................................................. 20
5.7.3 Wiring Diagram Pressure Switch ............................................................................ 20
5.7.4 Wiring Diagram Pressure Transmitter..................................................................... 21
5.7.5 Wiring Diagram Level Switch................................................................................. 21
5.7.6 Wiring Diagram Pressure Switch of Water-oil Heat Exchanger (Optional).............. 21
7.1 Maintenance Schedule ..................................................................................................... 25
7.2 Oil Level Inspection .......................................................................................................... 26
7.3 Oil and Oil Filter Change.................................................................................................. 26
7.4 Exhaust Filter Change....................................................................................................... 28
7.5 Coupling Maintenance ..................................................................................................... 29
7.6 Air Heat Exchanger Cleaning ............................................................................................ 29