24
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
TECHNICAL PASSPORT. INSTALLATION and OPERATION MANUAL
Type of
maintenance
Procedure
Duty of:
Weekly
Cleaning of combustion chamber by poker and scraper
brush
User
Monthly
Dismantling of combustion chamber housing (A).
Cleaning of combustion chamber by scraper brush and
vacuum cleaner. Replacement of gasket if faulty (see
Diagram 13)
User /
Installer
Yearly
Full dismantling and cleaning of burner. Replacement
of all gaskets (see Diagram 14.3.)
Installer
Diagram
13. Dismantling of the combustion chamber housing.
9. OPERATION OF BOILER WHEN
BURNING SOLID FUEL
9.1. Loading and ignition the boiler
When ignition the boiler for the first time,
a condensate is formed which is later
drained (this is not a fault in the boiler).
Fuel is loaded in the combustion chamber
and it is recommended to load logs of
length equal to the combustion chamber
length and stack them tight inside with
least possible air gaps. The chamber
door as well as all inspection openings
must be closed and sealed. Open the
thermostatic draft regulator and chimney
flap to ignite the boiler. When boiler
temperature reach 85°С, adjust intake air
by the chimney flap and boiler air-intake
door flap. The position of boiler air-intake
door flap adjust by thermostatic draft
regulator.
When burning wood with moisture
content more than 20%, results in:
- significantly increases fuel consumption;
- not reach the desired power;
- lifetime of the boiler and chimney fall.
Maintain operating temperature
between 65°C and 80°C.
9.2. Cleaning of the boiler
Caution! Hot surfaces.
Before cleaning the boiler, make
sure the fire in it has died out and
the boiler has cooled down.
Boiler cleaning must be carried out