5
4. All above ground gas piping upstream from manual
shut-off valve must be electrically continuous and
bonded to a grounding electrode. Do not use gas
piping as grounding electrode. Refer to
National
Electrical Code
, NFPA 70.
C.
Pressure test.
The boiler and its gas connection must
be leak tested before placing boiler in operation.
1. Protect boiler gas control valve. For all testing over
½ psig, boiler and its individual shutoff valve must
be disconnected from gas supply piping. For testing
at ½ psig or less, isolate boiler from gas supply
piping by closing boiler’s individual manual shutoff
valve.
2. Locate leaks using approved combustible gas
detector, soap and water, or similar nonflammable
solution.
DANGER
Do not use matches, candles, open flames or
other ignition source to check for leaks.
Содержание SCG
Страница 5: ...Figure 2 Dimensions...
Страница 13: ...13 Figure 4A Recommended Separate Horizontal Vent Air Intake Installation...
Страница 14: ...14 Figure 4B Alternate Separate Horizontal Vent Air Intake Installation...
Страница 15: ...15 Figure 5A Separate Horizontal Vent Air Intake Terminal Configuration SCG 3 thru 7...
Страница 16: ...16 Figure 5B Separate Horizontal Vent Air Intake Terminal Configuration SCG 8 and 9...
Страница 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Страница 22: ...22 Figure 9 Vertical Air Intake Piping...
Страница 25: ...25 Figure 10 Combination Horizontal Vent Air Installation SCG 3 thru 6...
Страница 26: ...26 Figure 11 Combination Horizontal Vent Air Terminal Installation SCG 3 thru 6...
Страница 38: ...38 Figure 12 Recommended Separate Horizontal Vent Installation...
Страница 39: ...39 Figure 13 Alternate Separate Horizontal Vent Installation...
Страница 44: ...44 Figure 22 Optional Separate Horizontal 4 Vent Terminal Installation Indoor Air...
Страница 48: ...48 Figure 25 Recommended Water Piping for Circulator Zoned Heating Systems...
Страница 49: ...49 Figure 26 Recommended Water Piping for Zone Valve Zoned Heating Systems...
Страница 54: ...54 Figure 28 Internal Boiler Wiring Schematic Diagram...
Страница 57: ...57 Figure 30 System Wiring Schematic for Single Zone Space Heating Only...
Страница 59: ...59 Figure 32 Circulator Zoned System Wiring Schematic...
Страница 60: ...60 Figure 33 Zone Valve Zoned System Wiring Schematic...
Страница 61: ...61 Figure 34 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Страница 63: ...63 Figure 35 Modular Boiler Gas Piping...
Страница 65: ...65 Figure 36 Operating Instructions...
Страница 68: ...68 Figure 38 Troubleshooting Guide Honeywell Electronic Ignition Troubleshooting Guide...
Страница 73: ...73 Figure 44 Flue and Burner Cleanout 1 Burner...
Страница 75: ...75 THIS PAGE LEFT INTENTIONALLY BLANK...
Страница 76: ...76...
Страница 77: ...77...
Страница 80: ...80...
Страница 82: ...82...
Страница 84: ...84...
Страница 86: ...86...
Страница 88: ...88...
Страница 90: ...90...
Страница 94: ...94 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...