![Burnham SCG Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/burnham/scg/scg_installation-and-service-instructions-manual_2832980029.webp)
9
• For a venting system that extends through
any zone above that on which the connected
appliance is located (except for one and two
family dwellings), the vent system shall be
enclosed with an enclosure having a fire
resistance rating equal to or greater than that of
the floor or roof assemblies through which it
passes.
• Design any enclosure to permit inspection of the
system.
• Do not place any type of insulation in any
required clearance spaces surrounding the vent
system.
6.
Vertical Installation Requirements:
a.
Seal weather exposed joints of the outer jacket
with foil tape or an exterior grade silicone
sealant.
b. The vent system must terminate at least 3 feet
above the roof line and at least 2 feet higher than
any portion of the building within 10 feet.
c. When terminated at a height of more than 6 feet
the stack must be supported by a support bracing.
The vent should be supported every 10 feet.
d. The total continuous distance of the vent system
from the appliance flue collar to the termination
shall not exceed that specified in the appliance
manufacturer’s installation instructions.
e. In cold climates do not install a condensate drain
on the exterior of the building. Doing so may
result in dangerous icy conditions on surfaces
near the drain and may cause damage to the vent
system and/or the building exterior.
f. Install supports every 10 feet vertically along the
vent pipe route. Vertical supports are required
after every transition to vertical and are required
after every offset elbow. When the vent is free
standing and penetrates a roof/ceiling another
means of support must be used at a second
location. Refer to the Vertical Supports section
in this manual.
Содержание SCG
Страница 5: ...Figure 2 Dimensions...
Страница 13: ...13 Figure 4A Recommended Separate Horizontal Vent Air Intake Installation...
Страница 14: ...14 Figure 4B Alternate Separate Horizontal Vent Air Intake Installation...
Страница 15: ...15 Figure 5A Separate Horizontal Vent Air Intake Terminal Configuration SCG 3 thru 7...
Страница 16: ...16 Figure 5B Separate Horizontal Vent Air Intake Terminal Configuration SCG 8 and 9...
Страница 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Страница 22: ...22 Figure 9 Vertical Air Intake Piping...
Страница 25: ...25 Figure 10 Combination Horizontal Vent Air Installation SCG 3 thru 6...
Страница 26: ...26 Figure 11 Combination Horizontal Vent Air Terminal Installation SCG 3 thru 6...
Страница 38: ...38 Figure 12 Recommended Separate Horizontal Vent Installation...
Страница 39: ...39 Figure 13 Alternate Separate Horizontal Vent Installation...
Страница 44: ...44 Figure 22 Optional Separate Horizontal 4 Vent Terminal Installation Indoor Air...
Страница 48: ...48 Figure 25 Recommended Water Piping for Circulator Zoned Heating Systems...
Страница 49: ...49 Figure 26 Recommended Water Piping for Zone Valve Zoned Heating Systems...
Страница 54: ...54 Figure 28 Internal Boiler Wiring Schematic Diagram...
Страница 57: ...57 Figure 30 System Wiring Schematic for Single Zone Space Heating Only...
Страница 59: ...59 Figure 32 Circulator Zoned System Wiring Schematic...
Страница 60: ...60 Figure 33 Zone Valve Zoned System Wiring Schematic...
Страница 61: ...61 Figure 34 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Страница 63: ...63 Figure 35 Modular Boiler Gas Piping...
Страница 65: ...65 Figure 36 Operating Instructions...
Страница 68: ...68 Figure 38 Troubleshooting Guide Honeywell Electronic Ignition Troubleshooting Guide...
Страница 73: ...73 Figure 44 Flue and Burner Cleanout 1 Burner...
Страница 75: ...75 THIS PAGE LEFT INTENTIONALLY BLANK...
Страница 76: ...76...
Страница 77: ...77...
Страница 80: ...80...
Страница 82: ...82...
Страница 84: ...84...
Страница 86: ...86...
Страница 88: ...88...
Страница 90: ...90...
Страница 94: ...94 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...