11.
Horizontal Supports:
Saf-T Vent SC must have supports for every six (6) feet of horizontal run and after every transition from vertical to
horizontal. Support hangers by themselves do not maintain the necessary clearances to combustible materials; be sure to
consider clearances when planning the system.
The supports must be secured to solid material using at least #10 fasteners. Do not fasten supports to drywall sheathing
without using hollow wall anchors. The conduit supports must maintain the ¼” per foot pitch to avoid collection of
condensate in the vent. Position the vent so that the welded seam is on the top.
0” Clearance Support Clamp, (SC_ _SUP):
Attach the bracket to the structure but do not tighten in place. Open the
hose clamp and slip it under the support bracket. Position the clamp between the mounting screws and rotate the clamp
so that the screw housing will be accessible after the vent is installed. Restart the threads on the hose clamp and securely
tighten the mounting screws to the structure. This can also be installed vertically.
1” Clearance Support Clamp, (SC_ _SUP1):
Supports the vent at 1” clearance to the structure. Line up the support
mounting brackets so that the mounting screws will follow the center line of the vent section. This can also be installed
vertically.
Содержание SCG
Страница 5: ...Figure 2 Dimensions...
Страница 13: ...13 Figure 4A Recommended Separate Horizontal Vent Air Intake Installation...
Страница 14: ...14 Figure 4B Alternate Separate Horizontal Vent Air Intake Installation...
Страница 15: ...15 Figure 5A Separate Horizontal Vent Air Intake Terminal Configuration SCG 3 thru 7...
Страница 16: ...16 Figure 5B Separate Horizontal Vent Air Intake Terminal Configuration SCG 8 and 9...
Страница 19: ...19 Figure 7 Attic Offset Figure 6 Vertical Vent Installation...
Страница 22: ...22 Figure 9 Vertical Air Intake Piping...
Страница 25: ...25 Figure 10 Combination Horizontal Vent Air Installation SCG 3 thru 6...
Страница 26: ...26 Figure 11 Combination Horizontal Vent Air Terminal Installation SCG 3 thru 6...
Страница 38: ...38 Figure 12 Recommended Separate Horizontal Vent Installation...
Страница 39: ...39 Figure 13 Alternate Separate Horizontal Vent Installation...
Страница 44: ...44 Figure 22 Optional Separate Horizontal 4 Vent Terminal Installation Indoor Air...
Страница 48: ...48 Figure 25 Recommended Water Piping for Circulator Zoned Heating Systems...
Страница 49: ...49 Figure 26 Recommended Water Piping for Zone Valve Zoned Heating Systems...
Страница 54: ...54 Figure 28 Internal Boiler Wiring Schematic Diagram...
Страница 57: ...57 Figure 30 System Wiring Schematic for Single Zone Space Heating Only...
Страница 59: ...59 Figure 32 Circulator Zoned System Wiring Schematic...
Страница 60: ...60 Figure 33 Zone Valve Zoned System Wiring Schematic...
Страница 61: ...61 Figure 34 Different Manufacturer s Zone Valve Connections to Honeywell R8889...
Страница 63: ...63 Figure 35 Modular Boiler Gas Piping...
Страница 65: ...65 Figure 36 Operating Instructions...
Страница 68: ...68 Figure 38 Troubleshooting Guide Honeywell Electronic Ignition Troubleshooting Guide...
Страница 73: ...73 Figure 44 Flue and Burner Cleanout 1 Burner...
Страница 75: ...75 THIS PAGE LEFT INTENTIONALLY BLANK...
Страница 76: ...76...
Страница 77: ...77...
Страница 80: ...80...
Страница 82: ...82...
Страница 84: ...84...
Страница 86: ...86...
Страница 88: ...88...
Страница 90: ...90...
Страница 94: ...94 SERVICE RECORD DATE SERVICE PERFORMED...
Страница 95: ...95 SERVICE RECORD DATE SERVICE PERFORMED...