50
10) Check the inlet pressure and adjust if necessary. Verify that the inlet pressure is between the upper and lower limits shown
on the rating plate with all gas appliances on and off.
WARNING
THE OUTLET PRESSURE FOR THE GAS VALVE HAS BEEN FACTORY SET
AND REQUIRES NO FIELD ADJUSTMENT. THIS SETTING IS SATISFACTORY
FOR BOTH NATURAL GAS AND PROPANE. ATTEMPTING TO ADJUST THE
OUTLET PRESSURE MAY RESULT IN DAMAGE TO THE GAS VALVE AND
CAUSE PROPERTY DAMAGE, PERSONAL INJURY OR LOSS OF LIFE.
7) Start the boiler using the lighting instructions on page 49. After the boiler is powered up, it should go through the following
sequence.
Sequence Display
Meaning
1
U.125
or Blank
Checking internal software (power-up only)
2
0.SWT
Boiler in standby.
SWT
= Supply Water Temp. No call for heat.
(After call for heat from heating thermostat)
3
A.SWT
Self-Check on Start-up
4
5.SWT
Blower and circulator on. Checking for adequate air
fl
ow.
5
1.SWT
Prepurge
6
2.SWT
Trial for ignition
7
3.SWT
Flame established. Boiler responding to a call for heat.
8) Upon initial start-up, the gas train will be
fi
lled with air. Even if the gas line has been completely purged of air, it may take
several tries for ignition before a
fl
ame is established. If more than 5 tries for ignition are needed, it will be necessary to
press the reset button to restart the boiler. Once a
fl
ame has been established for the
fi
rst time, subsequent calls for burner
operation should result in a
fl
ame on the
fi
rst try.
9) Inspect
the
fl
ame visible through the window. On high
fi
re the
fl
ame should be stable and mostly blue (Fig.11.1). No yellow
tipping should be present; however, intermittent
fl
ecks of yellow and orange in the
fl
ame are normal.
Figure 11.1: Burner Flame
Содержание FREEDOM FCM120
Страница 8: ...8 Figure 5 1 Wall Mounting Hole Locations ...
Страница 9: ...9 Figure 5 2 Boiler Mounting Hardware ...
Страница 11: ...11 Figure 6 1 Boiler Installed In A Confined Space Ventilation Air From Inside ...
Страница 22: ...22 Figure 7 10 Installation of Reducing Elbow on Concentric Boiler Collar Figure 7 11 Dimension L ...
Страница 24: ...24 Figure 7 14 Preparing Terminal Section for Installation in the Wall Figure 7 15 Attaching Terminal Section ...
Страница 31: ...31 Figure 7 21 Condensate Piping Arrangement ...
Страница 37: ...37 Figure 9 4c Modular Boiler Piping Figure 9 4b Piping Method 1 Indirect Water Heater Loop Piping Shaded ...
Страница 44: ...44 Figure 10 1 Wiring Connections Diagram ...
Страница 45: ...45 Figure 10 2 Ladder Diagram ...
Страница 46: ...46 Figure 10 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Страница 49: ...49 FCM Series Lighting and Operating Instructions ...
Страница 55: ...55 FIGURE 12 2 BASIC MENU TREE ...
Страница 64: ...64 ...
Страница 66: ...66 ...
Страница 68: ...68 ...
Страница 69: ...69 ...
Страница 70: ...70 ...
Страница 72: ...72 150 151 152 153 154 155 ...
Страница 73: ...73 156 157 158 159 160 161 ...
Страница 74: ...74 162 ...
Страница 75: ...75 NOTES ...
Страница 78: ...78 NOTES ...
Страница 79: ...79 NOTES ...
Страница 80: ......