6
TABLE 4.2: CLEARANCES FROM VENT PIPING TO COMBUSTIBLE CONSTRUCTION
TYPE OF VENT PIPE
PIPE DIRECTION
ENCLOSURE
MINIMUM CLEARANCE
TO COMBUSTIBLE
MATERIAL
60/100mm
CONCENTRIC VENT-
ING
VERTICAL OR
HORIZONTAL
ENCLOSED ON ALL FOUR
SIDES
0”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
FLEX-L STAR-34
VERTICAL OR
HORIZONTAL
AT LEAST ONE SIDE OPEN,
COMBUSTIBLE MATERIAL ON
A MAXIMUM OF THREE SIDES
1”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
FLEX-L STAR-34
HORIZONTAL OR VERTI-
CAL WITH OFFSETS
ENCLOSED ON ALL FOUR
SIDES
2-1/2”
HEAT FAB SAF-T VENT
PROTECH FASNSEAL
Z-FLEX Z-VENT III
FLEX-L STAR-34
VERTICAL WITH NO OFF-
SETS
ENCLOSED ON ALL FOUR
SIDES
2-1/2”
Содержание FREEDOM FCM120
Страница 8: ...8 Figure 5 1 Wall Mounting Hole Locations ...
Страница 9: ...9 Figure 5 2 Boiler Mounting Hardware ...
Страница 11: ...11 Figure 6 1 Boiler Installed In A Confined Space Ventilation Air From Inside ...
Страница 22: ...22 Figure 7 10 Installation of Reducing Elbow on Concentric Boiler Collar Figure 7 11 Dimension L ...
Страница 24: ...24 Figure 7 14 Preparing Terminal Section for Installation in the Wall Figure 7 15 Attaching Terminal Section ...
Страница 31: ...31 Figure 7 21 Condensate Piping Arrangement ...
Страница 37: ...37 Figure 9 4c Modular Boiler Piping Figure 9 4b Piping Method 1 Indirect Water Heater Loop Piping Shaded ...
Страница 44: ...44 Figure 10 1 Wiring Connections Diagram ...
Страница 45: ...45 Figure 10 2 Ladder Diagram ...
Страница 46: ...46 Figure 10 3 Wiring of Isolation Relay for Control of Two Heating Circulators ...
Страница 49: ...49 FCM Series Lighting and Operating Instructions ...
Страница 55: ...55 FIGURE 12 2 BASIC MENU TREE ...
Страница 64: ...64 ...
Страница 66: ...66 ...
Страница 68: ...68 ...
Страница 69: ...69 ...
Страница 70: ...70 ...
Страница 72: ...72 150 151 152 153 154 155 ...
Страница 73: ...73 156 157 158 159 160 161 ...
Страница 74: ...74 162 ...
Страница 75: ...75 NOTES ...
Страница 78: ...78 NOTES ...
Страница 79: ...79 NOTES ...
Страница 80: ......