Burnham 2PV Series Скачать руководство пользователя страница 32

32

Содержание 2PV Series

Страница 1: ...r e S d n a r e b m u N l e d o M r e l i o B e d i v o r p r e l i o b r e b m u N l e d o M r e l i o B _ _ _ _ I _ V P _ 0 2 r e b m u N l a i r e S r e l i o B _ _ _ _ _ _ _ 6 e t a D n o i t a l...

Страница 2: ...t u p n i s a g e c u d e r o t d e c i f i r o y l l a i c e p s n e e b F x i d n e p p A d n a 2 1 8 n o i t c e S 1 3 2 2 Z I S N A 4 5 A P F N e d o C s a G l e u F l a n o i t a N e h t r e p r...

Страница 3: ...n o i s n e m i D t n e t n o C r e t a W s n o l l a G g n i p p i h S x o r p p A b l t h g i e W A B C D V P 3 0 2 0 2 4 1 6 1 1 0 1 8 5 5 1 2 3 5 6 2 V P 4 0 2 3 2 7 1 1 1 8 5 5 1 4 9 0 3 V P 5 0...

Страница 4: ...s s a o t d e d i v o r p e b t s u m n o i t s u b m o c The following guideline is based on the National Fuel Gas Code NFPA 54 ANSI Z223 1 1 Determine volume of space boiler room Rooms communicatin...

Страница 5: ...al space s of sufficient volume such that combined volume of all spaces meet criteria for unconfined space Size each opening for minimum free area of 1 square inch per 1 000 Btu per hour input of all...

Страница 6: ...is a hot water boiler must be full of water to operate safely Refer to Section X for low water cut off piping and wiring instructions K If it is required to perform a long term pressure test of the hy...

Страница 7: ...trapped air L Oil grease and other foreign materials which accumulate in new hot water boilers and a new or reworked system should be boiled out and then thoroughly flushed A qualified water treatmen...

Страница 8: ...having jurisdiction specifies a gravity factor be applied For specific gravity greater than 0 70 apply gravity factor from Table 4 If exact specific gravity is not shown choose next higher value For m...

Страница 9: ...i c e p S y t i v a r G n o i t c e r r o C r o t c a F 0 5 0 0 1 1 0 3 1 7 0 1 5 5 0 4 0 1 0 4 1 4 0 1 0 6 0 0 0 1 0 5 1 0 0 1 5 6 0 6 9 0 0 6 1 7 9 0 0 7 0 3 9 0 0 7 1 4 9 0 5 7 0 0 9 0 0 8 0 7 8 0...

Страница 10: ...1 1 6 r e b m u n t r a p t i K n o i t i s n a r T t n e V A t n a l a e s f o e b u t e c n u o G N I N R A W r o c i l l a t e m n o n l e e t s s s e l n i a t s 6 1 3 e p y T r o 4 0 3 e p y T d...

Страница 11: ...e time of removal of an existing boiler the following steps shall be followed with each appliance remaining connected to the common venting system placed in operation while the other appliances remain...

Страница 12: ...using the procedure outlined below for the Gasket Less Vent System G N I N R A W f o h t g n e l d e l l a t s n i m u m i x a m d e e c x e r e v e N e p i p h t g n e l e l b a t s u j d a r o f s...

Страница 13: ...locking band and rest against the end of the female pipe Verify the factory installed gasket is not dislodged or cut d Smooth sealant around joint for a continuous seal Reapply sealant if necessary e...

Страница 14: ...e any door window or gravity air inlet d Minimum 4 feet 6 feet in Canada horizontally from and in no case above or below unless a 4 foot horizontal distance is maintained from electric meters gas mete...

Страница 15: ...s II circuit between thermostat and boiler Run wires through grommet in Jacket Left Side Panel Set thermostat heat anticipator to 0 6 amps See Figure 10 D Wire boiler Boiler is rated for 120 VAC 60 he...

Страница 16: ...one valves or balancing valves 3 Attach hose to hose bib located just below isolation valve in boiler supply piping Terminate hose in five gallon bucket at a suitable floor drain or outdoor area 4 Sta...

Страница 17: ...ame should have clearly defined inner cone with no yellow tipping Orange yellow streaks should not be confused with true yellow tipping Figure 16 Main Burner Flame J Check thermostat operation Raise a...

Страница 18: ...ifold pressure Do not reduce more than 0 3 inch w c If boiler is still overfired contact your Burnham distributor or Regional Office for replacement Gas Orifice b Increase input rate if less than 98 o...

Страница 19: ...19 Figure 17 Operating Instructions...

Страница 20: ...20...

Страница 21: ...21...

Страница 22: ...22...

Страница 23: ...ve gear 1 A National Institute for Occupational Safety and Health NIOSH approved respirator 2 Long sleeved loose fitting clothing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wa...

Страница 24: ...examine all flue passageways a If passageways are free of soot and obstruction replace canopy secure and seal using kit available from Burnham Distributors Part No 6111716 b If passageways need clean...

Страница 25: ...screws holding pilot burner to pilot bracket b Disconnect pilot tubing c Disconnect all other leads to pilot d Select pilot assembly with identical model number reconnect leads and pilot tubing Resecu...

Страница 26: ...Pressure 3 Start boiler and read pressure on manometer when boiler water temperature reaches operating temperature Refer to Table 8 for minimum readings NOTE If switch drops out before boiler reaches...

Страница 27: ...o m m o C 0 1 D 2 x e H y v a e H 0 2 t u N e r a w d r a H n o m m o C 2 E 2 F 2 o N y e K n i d e d u l c n I t e k s a G g n i t n u o M r e w o l B 8 4 0 6 0 2 8 1 9 4 0 6 0 2 8 1 F 2 r e w o l B...

Страница 28: ...1 D 3 y a r T r e n r u B 5 0 3 0 0 6 8 1 7 1 5 0 4 0 0 6 8 1 7 1 5 0 5 0 0 6 8 1 7 1 5 0 6 0 0 6 8 1 7 1 E 3 y l b m e s s A g e L e s a B 1 0 0 6 8 1 6 4 1 E 3 g e L e s a B 1 2 0 0 6 8 1 7 4 2 E 3...

Страница 29: ...3 4 0 0 6 2 2 8 1 3 5 0 0 6 2 2 8 1 3 6 0 0 6 2 2 8 1 l a r u t a N D 4 y l n O s a G k n i P 5 4 e c i f i r O r e n r u B n i a M 1 1 7 2 2 8 3 1 1 7 2 2 8 5 1 1 7 2 2 8 7 1 1 7 2 2 8 9 D 4 e n a p...

Страница 30: ...P A 5 o N y e K h t i w d e d u l c n I P K 6 4 1 8 8 3 l l e w y e n o H e n a p o r P P L e c i f i r O t o l i P C 5 T P N x D O 8 1 g n i t t i F t u N n o i s s e r p m o C E 5 d n a A 5 o N y e...

Страница 31: ...0 7 1 4 0 6 1 E 6 r o o D e l b a v o m e R t n o r F t e k c a J 4 4 3 0 7 1 4 0 6 1 4 4 4 0 7 1 4 0 6 1 4 4 5 0 7 1 4 0 6 1 4 4 6 0 7 1 4 0 6 1 F 6 l e n a P t n o r F r e w o L t e k c a J 3 1 3 0...

Страница 32: ...32...

Страница 33: ...0 6 1 0 6 1 1 E 7 V P 4 0 2 3 0 2 g n o L 2 1 x D I 6 1 3 g n i b u T e n o c i l i S h t g n e L y f i c e p S 7 0 0 6 1 0 9 V P 5 0 2 g n o L 3 1 x D I 6 1 3 g n i b u T e n o c i l i S V P 6 0 2 g...

Страница 34: ...y t i t n a u Q V P 3 0 2 V P 4 0 2 V P 5 0 2 V P 6 0 2 n o t r a C y r o s s e c c A t n e V d e t e k s a G 8 3 2 3 0 7 1 1 1 6 3 2 5 0 7 1 1 1 6 A 8 r o t c e n n o C t n e V 6 0 3 6 1 1 8 1 7 0 3...

Страница 35: ...o connect the probe LWCO to the supply or return piping as shown below LWCO Location draining the heating system Many probe LWCO manufacturers recommend an annual inspection of the probe How to Wire L...

Страница 36: ...l remedies in the courts THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE Limited Warranty FOR RESIDENTIAL CAST IRON WATER BOILERS 03 03...

Отзывы: