![Burnham 2PV Series Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/burnham/2pv-series/2pv-series_installation-operating-and-service-instructions_2832901015.webp)
15
VI. Electrical
A.
General.
Install wiring and ground boiler in accordance
with requirements of authority having jurisdiction, or in
absence of such requirements the
National Electrical
Code
, ANSI/NFPA 70, and/or the CSA C22.1 Electric
Code.
B.
Install thermostat.
Locate on inside wall
approximately 4 feet above fl oor. Do not install on
outside wall, near fi replace, or where infl uenced by
drafts or restricted air fl ow, hot or cold water pipes,
lighting fi xtures, television, or sunlight. Allow free air
movement by avoiding placement of furniture near
thermostat.
C.
Wire thermostat.
Provide Class II circuit between
thermostat and boiler. Run wires through grommet in
Jacket Left Side Panel. Set thermostat heat anticipator
to 0.6 amps. See Figure 10.
D.
Wire boiler.
Boiler is rated for 120 VAC, 60 hertz, less
than 12 amperes. A separate electrical circuit must be
run from the main electrical service with an over-
current device/disconnect in the circuit. A service
switch is recommended and may be required by some
local jurisdictions. Connect to black and white wires
and green ground screw. See Figure 10.
E.
Alliance water heater (if used).
See Figure 10. Also
refer to Alliance
Installation, Operating and Service
Instructions
.
F.
For installations using zone valves
provide separate
transformer for zone valve wiring. Consult zone valve
manufacturer for assistance.
Figure 10: Wiring Diagram
Содержание 2PV Series
Страница 19: ...19 Figure 17 Operating Instructions...
Страница 20: ...20...
Страница 21: ...21...
Страница 22: ...22...
Страница 32: ...32...