L.

  Check low water cut-off 

(if used). Drain boiler water 

below LWCO set point. Burners should extinguish.

M.

 Check limit.

1.  Adjust thermostat to highest setting.

2.  Observe temperature gauge. When temperature is 

indicated, adjust limit to setting below observed 
temperature. Main burners and pilot burner should 
extinguish and blower stop.

3.  Adjust limit to setting above observed temperature. 

Ignition sequence should begin.

4.  Adjust thermostat to lowest setting. Adjust limit to 

desired setting.

N.

  Adjust gas input rate to boiler (Natural Gas).

1.  Adjust thermostat to highest setting.

2.  Check manifold gas pressure. Manifold pressure is 

listed on rating label. Adjust gas valve pressure 
regulator as necessary (turn adjustment screw 
counterclockwise to decrease manifold pressure, or 
clockwise to increase manifold pressure). If pressure 
can not be attained, check gas valve inlet pressure. If 
less than minimum gas supply pressure listed on 
rating label, contact gas supplier for assistance.

3.  Clock gas meter for at least 30 seconds. Use Table 6 

to determine gas fl ow rate in Cubic Feet per Hour.

4.  Determine Input Rate. Multiply gas fl ow rate by gas 

heating value.

Table 6:  Gas Flow Rate in Cubic Feet per Hour

s

d

n

o

c

e

S

e

n

O

r

o

f

n

o

i

t

u

l

o

v

e

R

l

a

i

D

r

e

t

e

M

s

a

G

f

o

e

z

i

S

f

l

a

H

-

e

n

O

.

t

F

.

u

C

e

n

O

.

t

F

.

u

C

o

w

T

.

t

F

.

u

C

0

3

0

6

0

2

1

0

4

2

2

3

6

5

3

1

1

5

2

2

4

3

3

5

6

0

1

2

1

2

6

3

0

5

0

0

1

0

0

2

8

3

7

4

5

9

9

8

1

0

4

5

4

0

9

0

8

1

2

4

3

4

6

8

2

7

1

4

4

1

4

2

8

4

6

1

6

4

9

3

8

7

7

5

1

8

4

7

3

5

7

0

5

1

0

5

6

3

2

7

4

4

1

2

5

5

3

9

6

8

3

1

4

5

3

3

7

6

3

3

1

6

5

2

3

4

6

9

2

1

8

5

1

3

2

6

4

2

1

0

6

0

3

0

6

0

2

1

5.  Compare measured input rate to input rate listed on 

rating label. 

a.  Boiler must not be overfi red. Reduce input rate 

by decreasing manifold pressure. Do not reduce 
more than 0.3 inch w.c. If boiler is still overfi red, 
contact your Burnham distributor or Regional 
Offi ce for replacement Gas Orifi ce.

b.  Increase input rate if less than 98% of rating 

label input. Increase manifold gas pressure no 
more than 0.3 inch w.c. If measured input rate is 
still less than 98% of rated input:

i.

 

Remove Main Burners per procedure in 
Section VIII: Service.

ii.

  Remove gas orifi ces. Drill one (1) drill size 

larger (drill size is stamped on orifi ce, or see 
Key No. 4D).

iii.

  Reinstall gas orifi ces and main burners. 

Measure input rate.

6.  Recheck Main Burner Flame.

7.  Adjust thermostat to normal setting.

8.  Return other gas-fi red appliances to previous 

conditions of use.

O.

  Adjust gas input rate to boiler (LP/Propane).

1.  Adjust thermostat to highest setting.

2.  Check manifold pressure. Adjust gas valve pressure 

regulator to obtain 10 inches w.c. manifold pressure. 
Adjust gas valve pressure regulator as necessary 
(turn adjustment screw counterclockwise to decrease 
manifold pressure, or clockwise to increase 
manifold pressure). If pressure can not be attained, 
check gas valve inlet pressure. If less than minimum 
gas supply pressure listed on rating label, contact 
gas supplier for assistance.

3.  Recheck Main Burner Flame

4.  Adjust thermostat to normal setting.

P. 

COMBUSTION CHAMBER BURN-OFF

1.  The mineral wool combustion chamber panels 

contain a cornstarch based binder that must be 
burned out at installation to prevent odors during 
subsequent boiler operation.

2.  Ventilate the boiler room, set the high limit to its 

maximum setting, set the thermostat to call for heat.  
Allow the boiler to fi re for at least an hour or until 
the odor from the cornstarch has dissipated.

3.  Return the high limit and thermostat to their desired 

settings.

Q.

  Review User's Information Manual 

and system 

operation with owner or operator.

R.

 Post instructions

 near boiler for reference by owner 

and service personnel. Maintain instructions in legible 
condition.

Содержание 2PV Series

Страница 1: ...r e S d n a r e b m u N l e d o M r e l i o B e d i v o r p r e l i o b r e b m u N l e d o M r e l i o B _ _ _ _ I _ V P _ 0 2 r e b m u N l a i r e S r e l i o B _ _ _ _ _ _ _ 6 e t a D n o i t a l...

Страница 2: ...t u p n i s a g e c u d e r o t d e c i f i r o y l l a i c e p s n e e b F x i d n e p p A d n a 2 1 8 n o i t c e S 1 3 2 2 Z I S N A 4 5 A P F N e d o C s a G l e u F l a n o i t a N e h t r e p r...

Страница 3: ...n o i s n e m i D t n e t n o C r e t a W s n o l l a G g n i p p i h S x o r p p A b l t h g i e W A B C D V P 3 0 2 0 2 4 1 6 1 1 0 1 8 5 5 1 2 3 5 6 2 V P 4 0 2 3 2 7 1 1 1 8 5 5 1 4 9 0 3 V P 5 0...

Страница 4: ...s s a o t d e d i v o r p e b t s u m n o i t s u b m o c The following guideline is based on the National Fuel Gas Code NFPA 54 ANSI Z223 1 1 Determine volume of space boiler room Rooms communicatin...

Страница 5: ...al space s of sufficient volume such that combined volume of all spaces meet criteria for unconfined space Size each opening for minimum free area of 1 square inch per 1 000 Btu per hour input of all...

Страница 6: ...is a hot water boiler must be full of water to operate safely Refer to Section X for low water cut off piping and wiring instructions K If it is required to perform a long term pressure test of the hy...

Страница 7: ...trapped air L Oil grease and other foreign materials which accumulate in new hot water boilers and a new or reworked system should be boiled out and then thoroughly flushed A qualified water treatmen...

Страница 8: ...having jurisdiction specifies a gravity factor be applied For specific gravity greater than 0 70 apply gravity factor from Table 4 If exact specific gravity is not shown choose next higher value For m...

Страница 9: ...i c e p S y t i v a r G n o i t c e r r o C r o t c a F 0 5 0 0 1 1 0 3 1 7 0 1 5 5 0 4 0 1 0 4 1 4 0 1 0 6 0 0 0 1 0 5 1 0 0 1 5 6 0 6 9 0 0 6 1 7 9 0 0 7 0 3 9 0 0 7 1 4 9 0 5 7 0 0 9 0 0 8 0 7 8 0...

Страница 10: ...1 1 6 r e b m u n t r a p t i K n o i t i s n a r T t n e V A t n a l a e s f o e b u t e c n u o G N I N R A W r o c i l l a t e m n o n l e e t s s s e l n i a t s 6 1 3 e p y T r o 4 0 3 e p y T d...

Страница 11: ...e time of removal of an existing boiler the following steps shall be followed with each appliance remaining connected to the common venting system placed in operation while the other appliances remain...

Страница 12: ...using the procedure outlined below for the Gasket Less Vent System G N I N R A W f o h t g n e l d e l l a t s n i m u m i x a m d e e c x e r e v e N e p i p h t g n e l e l b a t s u j d a r o f s...

Страница 13: ...locking band and rest against the end of the female pipe Verify the factory installed gasket is not dislodged or cut d Smooth sealant around joint for a continuous seal Reapply sealant if necessary e...

Страница 14: ...e any door window or gravity air inlet d Minimum 4 feet 6 feet in Canada horizontally from and in no case above or below unless a 4 foot horizontal distance is maintained from electric meters gas mete...

Страница 15: ...s II circuit between thermostat and boiler Run wires through grommet in Jacket Left Side Panel Set thermostat heat anticipator to 0 6 amps See Figure 10 D Wire boiler Boiler is rated for 120 VAC 60 he...

Страница 16: ...one valves or balancing valves 3 Attach hose to hose bib located just below isolation valve in boiler supply piping Terminate hose in five gallon bucket at a suitable floor drain or outdoor area 4 Sta...

Страница 17: ...ame should have clearly defined inner cone with no yellow tipping Orange yellow streaks should not be confused with true yellow tipping Figure 16 Main Burner Flame J Check thermostat operation Raise a...

Страница 18: ...ifold pressure Do not reduce more than 0 3 inch w c If boiler is still overfired contact your Burnham distributor or Regional Office for replacement Gas Orifice b Increase input rate if less than 98 o...

Страница 19: ...19 Figure 17 Operating Instructions...

Страница 20: ...20...

Страница 21: ...21...

Страница 22: ...22...

Страница 23: ...ve gear 1 A National Institute for Occupational Safety and Health NIOSH approved respirator 2 Long sleeved loose fitting clothing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wa...

Страница 24: ...examine all flue passageways a If passageways are free of soot and obstruction replace canopy secure and seal using kit available from Burnham Distributors Part No 6111716 b If passageways need clean...

Страница 25: ...screws holding pilot burner to pilot bracket b Disconnect pilot tubing c Disconnect all other leads to pilot d Select pilot assembly with identical model number reconnect leads and pilot tubing Resecu...

Страница 26: ...Pressure 3 Start boiler and read pressure on manometer when boiler water temperature reaches operating temperature Refer to Table 8 for minimum readings NOTE If switch drops out before boiler reaches...

Страница 27: ...o m m o C 0 1 D 2 x e H y v a e H 0 2 t u N e r a w d r a H n o m m o C 2 E 2 F 2 o N y e K n i d e d u l c n I t e k s a G g n i t n u o M r e w o l B 8 4 0 6 0 2 8 1 9 4 0 6 0 2 8 1 F 2 r e w o l B...

Страница 28: ...1 D 3 y a r T r e n r u B 5 0 3 0 0 6 8 1 7 1 5 0 4 0 0 6 8 1 7 1 5 0 5 0 0 6 8 1 7 1 5 0 6 0 0 6 8 1 7 1 E 3 y l b m e s s A g e L e s a B 1 0 0 6 8 1 6 4 1 E 3 g e L e s a B 1 2 0 0 6 8 1 7 4 2 E 3...

Страница 29: ...3 4 0 0 6 2 2 8 1 3 5 0 0 6 2 2 8 1 3 6 0 0 6 2 2 8 1 l a r u t a N D 4 y l n O s a G k n i P 5 4 e c i f i r O r e n r u B n i a M 1 1 7 2 2 8 3 1 1 7 2 2 8 5 1 1 7 2 2 8 7 1 1 7 2 2 8 9 D 4 e n a p...

Страница 30: ...P A 5 o N y e K h t i w d e d u l c n I P K 6 4 1 8 8 3 l l e w y e n o H e n a p o r P P L e c i f i r O t o l i P C 5 T P N x D O 8 1 g n i t t i F t u N n o i s s e r p m o C E 5 d n a A 5 o N y e...

Страница 31: ...0 7 1 4 0 6 1 E 6 r o o D e l b a v o m e R t n o r F t e k c a J 4 4 3 0 7 1 4 0 6 1 4 4 4 0 7 1 4 0 6 1 4 4 5 0 7 1 4 0 6 1 4 4 6 0 7 1 4 0 6 1 F 6 l e n a P t n o r F r e w o L t e k c a J 3 1 3 0...

Страница 32: ...32...

Страница 33: ...0 6 1 0 6 1 1 E 7 V P 4 0 2 3 0 2 g n o L 2 1 x D I 6 1 3 g n i b u T e n o c i l i S h t g n e L y f i c e p S 7 0 0 6 1 0 9 V P 5 0 2 g n o L 3 1 x D I 6 1 3 g n i b u T e n o c i l i S V P 6 0 2 g...

Страница 34: ...y t i t n a u Q V P 3 0 2 V P 4 0 2 V P 5 0 2 V P 6 0 2 n o t r a C y r o s s e c c A t n e V d e t e k s a G 8 3 2 3 0 7 1 1 1 6 3 2 5 0 7 1 1 1 6 A 8 r o t c e n n o C t n e V 6 0 3 6 1 1 8 1 7 0 3...

Страница 35: ...o connect the probe LWCO to the supply or return piping as shown below LWCO Location draining the heating system Many probe LWCO manufacturers recommend an annual inspection of the probe How to Wire L...

Страница 36: ...l remedies in the courts THIS WARRANTY GIVES YOU SPECIFIC LEGAL RIGHTS AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE Limited Warranty FOR RESIDENTIAL CAST IRON WATER BOILERS 03 03...

Отзывы: