4
INITIAL SET-UP - PAFP & LAFT
1.
Loosen auger motor cover screws.
2.
Remove rear plastic plug from trim strip between hopper drip trays.
3.
Install support rod into hole in trim strip.
4.
Place PAF platform assembly on top of motor covers.
5.
Tighten support rod from top of platform.
6.
Retighten motor cover screws.
7.
Plug RCA cord into ULTRA base unit.
8.
Install hopper seal and press firmly into place on the flange of the cooling drum.
9. Align the auger shaft with the flat fin of the auger. Push the augers as far as they will go and rotate them
so the flat fin is facing up.
10. Place level probes in notch in rim of hoppers and install hoppers.
10. Install LAFT units onto hoppers and platform.
11. Plug LAFT power cord into rear of platform.
12. Plug LAFT platform power cord into proper electrical outlet.
13. Attach a flexible water line and product line to the .25” flare fitting on the back panel of the LAFT.
NOTE: A water strainer assembly (BUNN-O-MATIC #23820.1000) should be installed in line prior to the flexible
water line. Water supply pressure should be between 30 and 80 psi.
NOTE - Water pipe connections and fixtures directly connected to a potable water supply shall be sized, installed
and maintained in accordance with federal, state and local codes.
NOTE - Product line supply pressure should be between 30 and 80 psi.
44795.1 022112