Page 3
INTRODUCTION
This equipment will brew coffee into an awaiting server or airpot. The brewer may have an auxillary hot water
faucet. It is only for indoor use on a sturdy and level counter or shelf. Please install in an area where there are
no water jet devices.
The Infusion Series, similar to the DBC BrewWISE, incorporates a wireless interface system that allows the
MHG or DBC Grinders to load certain information into the "programming chip" located inside the handle of the
funnel. This information includes what flavor of coffee is being ground and what batch size will be brewed (half
or full). Once the correct flavor name and amount of coffee is ground, the funnel is loaded into the brewer. The
information from the funnel handle is then transferred into the brewer. The brewer then takes this information
and dispenses the amount of water preset in the brewer for that particular flavor of coffee and batch size. The
brewer can also be programmed to adjust different functions of the brewing process, such as brew temperature,
brew volumes, bypass percentages, pulse brew, etc. This allows the operator to program a certain "recipe" for
each coffee flavor to be brewed.
The Infusion Series Coffee Brewer is able to brew both hot tea and coffee with recipe settings and has the fol-
lowing features: By-Pass, Pre-Infusion and Pulse Brew, BrewWISE, and LCD for digital readout and programming
along with the Smart Funnel options for coffee. Other features are Energy Savings mode, BUNNLink compatible,
Smart Reader compatible, Freshness Timer and Sanitation Alert.
CONTENTS
Warranty .............................................................................................................2
Introduction ........................................................................................................3
User Notices .......................................................................................................4
Electrical Requirements ......................................................................................5
Plumbing Requirements .....................................................................................6
Tank Drain ...........................................................................................................6
Operating Controls ..............................................................................................7
Initial Set-Up .......................................................................................................8
Viewing Assigned Recipes and Asset Number ....................................................8
Coffee Brewing ....................................................................................................9
Cleaning ............................................................................................................10
Glossary ............................................................................................................11
Programming ....................................................................................................13
Troubleshooting ................................................................................................55
Wiring Diagram .................................................................................................66
38112.1 042105