background image

Page 17

SERVICE (cont.)

SOLENOID VALVE

Location:

The  solenoid  valve  is  located  inside  the  bottom

right side of the trunk mounted on the base.

Test Procedures:
1. Disconnect the brewer from the power source.
2. Disconnect the white/red and white/green wires

from the solenoid valve. With the "ON/OFF" switch
in the "ON" upper position press the start switch.

3. With  a  voltmeter,  check  the  voltage  across  the

white/red  and  white/green  wires.  Connect  the
brewer to the power source. The indication must
be:
a) 120 volts ac for two wire 120 volt models, three
wire 120/208 and 120/240 volt models.
b) 200 to 240 volts ac for two wire 200 or 240 volt
models.

4. Disconnect the brewer from the power source,

If voltage is present as described, proceed to #5.
If voltage is not present as described, refer to 

Wiring

Diagrams

 and check brewer wiring harness.

5. Check for continuity across the solenoid valve coil

terminals.

If  continuity  is  present  as  described,  reconnect  the

white/red and white/green wire from the timer.
If continuity is not present as described, replace the
solenoid valve.

6. Check the solenoid valve for coil action. Connect

the  brewer  to  the  power  source.  With  "ON/OFF"
switch in the "ON" upper position press start switch
and listen carefully in the vicinity of the solenoid
valve  for  a  "clicking"  sound  as  the  coil  magnet
attracts.

7. Disconnect the brewer from the power source.

If the sound is heard as described and water will not
pass  through  the  solenoid  valve,  there  may  be  a
blockage in the water line before the solenoid valve, or
the solenoid valve may require inspection for wear,
and removal of waterborne particles.
If  the  sound  is  not  heard  as  described,  replace  the
solenoid valve.

Removal and Replacement:
1. Remove the white/red and white/green wires from

the solenoid valve.

2. Turn off the water supply to the brewer.
3. Disconnect the water lines to and from the sole-

noid valve.

4. Remove the two #8-32 nuts securing the solenoid

mounting bracket to the base. Remove solenoid
bracket and solenoid valve as an assembly.

5. Remove the two #10-32 screws and lockwashers

securing the solenoid valve to the solenoid bracket.

6. Using two #10-32 screws and lockwashers install

new  solenoid valve on solenoid mounting bracket.

7. Using two #8-32 nuts install solenoid valve and

bracket to the base of the brewer.

8. Securely  fasten  the  water  lines  to  and  from  the

solenoid valve.

9. Refer to Fig. 9 when reconnecting the wires.

ON

OFF

ST

AR

T

B

U

N

N

90 psig m

ax operating pressure

Strainer/Flow Control # 24222.0222

(Repl. Flow W

asher #20526.0222 )

(Repl. Screen #23721.0000)

.222 gpm FLOW

P2267

P1174

27479 121500

FIG. 8 SOLENOID VALVE

FIG. 9 SOLENOID VALVE TERMINALS

WHI/GRN to Timer TL4

WHI/RED to Timer TL1

All manuals and user guides at all-guides.com

Содержание GMB-PS

Страница 1: ...E D BO ILED DR Y HE AT ED WHE N EM PT Y US ED ON HIGH FL AM E OR EX PO SE D EL EC TR IC EL EM EN TS FA ILURE TO COMPL Y RISKS INJU RY PN 658 198 5 BU NN O MA TIC CO RP OR AT ION FU NNEL CONTE NTS ARE...

Страница 2: ...Y OR FITNESS FOR A PARTICULAR PURPOSE The agents dealers or employees of Bunn are not authorized to make modifications to this warranty or to make additional warranties that are binding on Bunn Accord...

Страница 3: ...ED ON HIGH FLAME OR EXPOSED ELECTRIC ELEMENTS READ THE ENTIRE OPERATING MANUAL BEFORE USING THIS PRODUCT FAILURE TO COMPLY RISKS INJURY PN 00658 0000F 6 98 1985 BUNN O MATIC CORPORATION 00831 0000F 3...

Страница 4: ...REQUIREMENTS This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi 138 and620kPa froma1 2 orlargersupplyline Ashut offvalveshouldbeinstalledinthelinebefore...

Страница 5: ...opped flowing from the funnel and let the water in the tank reheat to the proper temperature 7 Placethe ON OFF switchinthe ON upperposition andmomentarilypressandreleasethestartswitch Check the water...

Страница 6: ...ng to be done until switch is once again placed in the SET position OPERATING CONTROLS ON OFF SWITCH Placing the ON OFF switch in the OFF lower position stops brewing Stopping a brew cycle after it ha...

Страница 7: ...edorloosened Thiswillhelp to avoid twists and kinks in the tubing Make certain that all plumbing connections are sealed and electrical connections tight and isolated This brewer is heated at all times...

Страница 8: ...ions Clear or replace A Direction of flow arrow must be pointing towards brewer B Removestrainerandcheckfor obstructions Clear or replace Refer to Service Limit Thermo stat for testing procedures See...

Страница 9: ...row must be pointing towards the brewer B Remove the flow control and check for obstructions Clear or replace A Direction of flow arrow must be pointing towards the brewer B Removethestrainerandcheck...

Страница 10: ...er condi tions Excessive mineral build up on stainless steel surfaces can ini tiate corrosive reactions resulting in serious leaks 3 Solenoid Valve 1 Timer REMEDY A Direction of flow arrow must be poi...

Страница 11: ...and clear any obstructions Rebuild or replace the valve if necessary See page 17 BUNN paperfiltersmustbeused for proper extraction A fine or drip grind must be used for proper extraction Aseven holest...

Страница 12: ...ofgroundsleveledbygentlyshak ing The nut on the solenoid must be tight or it will vibrate during op eration Plumbing lines should not resting on the counter top A Thebrewermustbeconnected to a cold wa...

Страница 13: ...Inspection testing and repair of electri cal equipment should be performed only by qualified service personnel The brewer should be unplugged when servicing except when electrical tests are re quired...

Страница 14: ...2267 P1171 27479 091596 to the power source The indication must be a 120 volts ac for two wire 120 volt models three wire 120 208 and 120 240 volt models b 200 to 240 volts ac for two wire 200 volt or...

Страница 15: ...s operating properly If continuity is not present as described replace the limit thermostat P2267 P1800 BLU BLK Lead to Control Thermo stat BLK to Power Cord or Terminal Block Black Insert 27479 12150...

Страница 16: ...rewer wiring har ness 5 With the black wire removed remove the white red wire from the lower terminal 6 Check for continuity across the center and lower terminal with the switch in the ON position Con...

Страница 17: ...noid valve for a clicking sound as the coil magnet attracts 7 Disconnect the brewer from the power source If the sound is heard as described and water will not pass through the solenoid valve there ma...

Страница 18: ...he white orange wire to the top terminal and the white yellow wire to the bottom terminal If continuity is not present as described replace the switch ON OF F ST AR T N operating pressure Control 2422...

Страница 19: ...P1176 27479 121500 FIG 13 TANK HEATER TERMINALS Removal and Replacement 1 Shut off water supply to the brewer 2 Disconnect the water supply tubes on the tank lid for the tank and the faucet coil asse...

Страница 20: ...d proceed to 7 If voltage is not present as described refer to Wiring Diagrams and check the brewer wiring harness MI NU TE S BU NN O M AT IC P N 26 20 12 0 VA C ON OF F ST AR T P1170 P1177 27479 1215...

Страница 21: ...r source and replace the timer 7 With a voltmeter check the voltage across termi nals TL1 and TL4 when the ON OFF switch is in the ON position Connectthebrewertothepower source and press the START swi...

Страница 22: ...d Place the ON OFF switch in the ON position press and hold the START switch until three distinct clicks are heard and then release the switch Failure to release the switch within two seconds after th...

Страница 23: ...Page 23 27479 091596 All manuals and user guides at all guides com...

Страница 24: ...Page 24 27479 091596 All manuals and user guides at all guides com...

Отзывы: