background image

5

INITIAL SET-UP

1.  Open the top lid. Clear all foreign objects and shipping material  from the hopper compartment and the en-

trance to the grind chamber.

2.  Plug in the grinder.

3.  Fill the hopper compartments with whole bean coffee. (Capacity 6 pounds each). The grinder is now ready 

for use.

d

d

c

b

a

OPERATING CONTROLS

Grind Pad (a)

 

Pressing the GRIND button initiates a timed grind cycle.

Stop Pad (b)

 

Pressing the STOP button ends the operation of the grinder.

® PAD (c)

 

Pressing the ® pad allows programming access (see page 6).

Hopper/Batch Selector Pads (d)

 

These pads are located on the funnel depictions on each side of the grinder with a total of 6 pads.  Selecting 

one of these pads will select the amount of grind and side from which to grind.

  Example:  Selecting the lower pad on the left side will grind enough beans from the left side of the grinder 

to brew the amount programmed into grinder.

Power ON/OFF Pad (e) (100V Models)

 

Pressing the ON/OFF pad alternately turns the grinder on and off.

Control Board

 

 

The control board determines the amount of beans that will leave the hopper in a grind cycle. The timer por-

tion can be adjusted to dispense a different amount from each hopper and each batch size. The scale is from 0.4 

to 99.9 seconds.  Refer to the Adjustments section for timer setting chart (page 8).

e

33736  030205

Содержание G9-2T DB

Страница 1: ...3227 PHONE 217 529 6601 FAX 217 529 6644 To ensure you have the latest revision of the Operating Manual or to view the Illustrated Parts Catalog Programming Manual or Service Manual please visit the...

Страница 2: ...s to this warranty or to make additional warranties that are binding on BUNN Accordingly statements by such individuals whether oral or written do not constitute warranties and should not be relied up...

Страница 3: ...R SHOCK HAZARD Use only on a properly protected circuit capable of the rated load Electrically ground the chassis Follow national local electrical codes Do not use near combustibles WARNING 20545 0000...

Страница 4: ...ere the temperature is between 5 C to 35 C Appliance shall not be tilted more than 10 for safe operation An electrician must provide electrical service as specified in conformance with all local and n...

Страница 5: ...are located on the funnel depictions on each side of the grinder with a total of 6 pads Selecting one of these pads will select the amount of grind and side from which to grind Example Selecting the l...

Страница 6: ...r plate rotor cup and front cover to the burr housing 8 Reinstall the upper front inspection panel 9 Refer to the Adjustment section of the Operating and Service manual for burr adjustments COFFEE GRI...

Страница 7: ...s in a counterclockwise direction 33736 072310 COMMUNICATING WITH COFFEE BREWER When the grinder is used with its companion brewer the name of the coffee and the size of the batch ground is communicat...

Страница 8: ...eturn to the normal operating mode NOTE If a number is chosen from the chart below and entered into the grinder check to be sure the number entered represents the name of the coffee on the chart 1 Gri...

Страница 9: ...Use the table below to find approximate timer setting for the grind and amount of coffee desired 3 To enter the setup mode and make an adjustment press and hold the hidden programming pad under the On...

Отзывы: