Bunn Crescendo Series Скачать руководство пользователя страница 9

9

042319

PLUMBING REQUIREMENTS

This dispenser must be connected to a 

cold water

 system with operating pressure between 138 - .620 MPa 

(20 and 90 psi) from a 1⁄2” or larger supply line. A shut-off valve should be installed in the line before the dispenser.  

Install a regulator in the line when pressure is greater than .620 MPa (90 psi) to reduce it to .345 MPa (50 psi).  

The water inlet fitting is 3/4” NPT (US and Canada Models) and 3/4 British Parallel Pipe for all other models.

NOTE

:

 Bunn-O-Matic recommends 6mm copper tubing for installations of less than 25 feet and 8mm for more than 

25 feet from the water supply line. At least 18 inches of an FDA approved flexible beverage tubing, such as reinforced 

braided polyethylene or silicone, before the dispenser will facilitate movement to clean the counter top. Bunn-O-Matic 

does not recommend the use of a saddle valve to install the dispenser. The size and shape of the hole made in the 

supply line by this type of device may restrict water flow.

NOTE

:

 If a backflow preventer is required by code, a shock arrestor should be installed between backflow preventer and 

dispenser. Installing the shock arrestor as close to the dispenser as possible will provide the best results.

NOTE

:

 Water pipe connections and fixtures directly connected to a potable water supply shall be sized, installed and 

maintained in accordance with federal, state and local codes.

PLUMBING HOOK-UP

NOTE: 

The plumbing connection is located on the back of the unit, using the water line included with some models, that 

connects to a 3/8” male flare or 3/4” hose thread.

1.  Flush the water line and securely attach it to the valve threads on the rear of the dispenser.

2.  Turn on the water supply.

INITIAL FILL & HEAT

1.  Turn on the water supply, connect power to the dispenser, and place the main power switch on the rear of the 

machine to the ON position.

2.  Water will automatically flow into the soluble tank to the proper level, then shut off.  This will take less than five 

minutes. In the event that a message appears “fill time too long” powder cycle to clear the message.

3.  The screen on the front door will display FILL ESPRSO TANK.  Press the button under START.  

4.  The screen will display MOVING BREW CHAMBER, ESP TANK FILLING, and the espresso tank will begin filling. This 

may take several minutes. In the event that a message appears “fill time too long”, flip the toggle switch to program 

mode, then back to normal position to clear the message.

5.  When water dispenses from the espresso nozzle into the drip tray, press YES under WATER DISPENSED? to stop 

the tank filling.  

6.  The tanks will then begin heating.  When the tanks have completed heating, the display will read “READY TO BREW 

SELECT SIZE”.

  

PRESET TANK TEMPERATURE

The tank temperatures have been preset at the factory to 80°C (180°F) for the soluble tank, and 102°C (215°F) for the 

espresso tank.  Bunn recommends that to provide the best quality beverage, the installer adjust the tank temperature to 

the powder product manufacturers recommended temperature for the hot powder product being used.

1.    Fill the hopper(s) with the dry product to be dispensed.

2.    Fill the bean hopper with the whole beans to be ground and brewed. A grinder calibration should be performed.

LIQUID LEVEL CONTROL

The system automatically maintains the soluble hot water tank’s level by energizing the refill solenoid when the water 

level drops below the liquid level probe. If the system has not successfully refilled, a refill error occurs. When a refill error  

occurs, the refill solenoid is de-energized. Once the cause of the refill error has been investigated and cured, the system 

can be reset by either cycling the power to the machine (at least five seconds) using the main power switch at the rear of 

the machine, or by entering one of the program modes (see Programming Modes.)

As directed in the International Plumbing Code of the International Code Council and the Food Code Manual of 

the Food and Drug Administration (FDA), this equipment must be installed with adequate backflow prevention to 

comply with federal, state and local codes. For models installed outside the U.S.A., you must comply with the  

applicable Plumbing /Sanitation Code for your area.

Содержание Crescendo Series

Страница 1: ...tely FREE and the quickest way to obtain the latest catalog and manual updates For Technical Service contact Bunn O Matic Corporation at 1 800 286 6070 52384 0001 D 04 19 2016 Bunn O Matic Corporation...

Страница 2: ...ons to this warranty or to make additional warranties that are binding on BUNN Accordingly statements by such individuals whether oral or written do not constitute warranties and should not be relied...

Страница 3: ...0 Operating Controls and Interface 11 Creating Custom Beverage 12 Through Counter Option 16 General Cleaning 17 Preventive Maintenance 25 Adjustments 26 Door Safety Interlock 30 Wiring Schematic 31 Ti...

Страница 4: ...w national local electrical codes Do not use near combustibles Do not deform plug or cord To reduce the risk of electric shock do not remove or open cover No user serviceable parts inside Authorized s...

Страница 5: ...o be used in applications such as farm houses Access to the service areas permitted by Authorized Service personnel only The A Weighted sound pressure level is below 70 dBA NORTH AMERICAN REQUIREMENTS...

Страница 6: ...tray into the opening in the lower front of the machine 2 Remove the espresso brew group from the parts box 3 Slide tube onto elbow fitting on upper left side of espresso group head as shown in Figur...

Страница 7: ...Figure 3 P4377 7 Slide red lock to the right until it snaps into place as shown in Figure 4 Figure 4 P4378 8 Install group head tube into quick connect fitting on bottom of espresso drive insuring tha...

Страница 8: ...t the dispenser to the power source 4 If plumbing is to be hooked up later be sure the dispenser is disconnected from the power source If plumbing has been hooked up the dispenser is ready for Initial...

Страница 9: ...event that a message appears fill time too long powder cycle to clear the message 3 The screen on the front door will display FILL ESPRSO TANK Press the button under START 4 The screen will display M...

Страница 10: ...r hoppers by lifting the front of the powder hopper until the peg on the bottom of the hopper clears the hole in the mounting plate see Figure 1 Then pull the hopper forward to remove 3 Set the hopper...

Страница 11: ...quence OPERATING THE DISPENSER The NORMAL PROGRAM RINSE switch must be in the NORMAL position 1 Place a cup on the drip tray beneath the dispense nozzle 2 In the area marked 1 of the control panel a M...

Страница 12: ...placed with one which matches the beverage reassignments made in this mode All settings can be adjusted to preference Set Espresso Shots The sub menus for adjusting an espresso shot are located under...

Страница 13: ...ub menus for adjusting recipes are located under this option Set the toggle switch to Program mode STEP 1 Advance to the RECIPE SETUP screen STEP 2 PROGRAM MODE PRESS TO ENTER Press SELECT STEP 3 1 SE...

Страница 14: ...n Cannot choose NONE Navigate to the next setting STEP 10 1st POWDER DIL HPR RIGHT 1 SELECT SIZE Use to Navigate Sets the amount of product used for the recipe that comes from the hopper If a hopper i...

Страница 15: ...t setting STEP 4 SM ESP GRIND TIME sec 1 SELECT SIZE Use to Navigate Use to decrease Use to increase Press a dispense switch to perform a catch test for a small grind Navigate to the next setting STEP...

Страница 16: ...e the cover 5 Used coffee puck will now fall through the opening in the chassis 6 Position the Crescendo so that the opening in the bottom of the machine coincides with the hole in the countertop 7 To...

Страница 17: ...main screen 5 Place the NORMAL PROGRAM RINSE switch to the NORMAL position To place the unit in the ENERGY SAVER mode 1 Open the door and place the NORMAL PROGRAM RINSE switch in the RINSE position 2...

Страница 18: ...panel door and cabinet with a clean damp cloth WEEKLY PARTS WASHING 1 Remove the elbows and slide gates from all hoppers Disconnect the elbows from the outlets of both mixing chambers 2 Remove the po...

Страница 19: ...ando RUN PROGRAM RINSE en la posici n de lavado RINSE y apretar el bot n bajo RINSE Luego aprete cualquier bot n dispensador de bebida 2 Empuje la compuerta deslizante frente a los codos de la tolva h...

Страница 20: ...ve Head Cake Pusher with lukewarm water only paying special attention to the channels 4 Insert cleaning brush into each side of the brewer housing and under lukewarm water turn the cogs 2 Remove Sieve...

Страница 21: ...assemble the brewer making sure the gear wheels are aligned open for sieve head insertion 6 Re attach the water inlet hose and place the brewer back in the drive unit 7 Reconnect outlet hose slide the...

Страница 22: ...under the dispense nozzles 3 Press the button under RINSE on the screen 4 Press any beverage selection button 5 The dispenser will automatically run hot water through both soluble mixing chambers and...

Страница 23: ...CYCLE WEEKLY 1 Open the door and place the NORMAL PROGRAM RINSE switch in the RINSE position 2 Press the button under CLEAN on the screen 3 When the screen prompts ADD CLEANING TABLET open the dispen...

Страница 24: ...under NEXT 6 When screen displays PRESS DISPENSE TO START press any beverage dispense button to begin cleaning cycle 7 During the cleaning cycle the screen with display CLEANING CYCLE IN PROGRESS PRES...

Страница 25: ...er counter clock wise and remover from shaft by pulling straight out NOTE Ensure O ring and shaft seal are in place during re assembly Remove right frother disk from shaft by pulling straight out Remo...

Страница 26: ...0000 Qty 2 Impeller 4mm Qty 2 O ring 1 48 ID Blender Base 247 Series Qty 2 Gasket Silicone Blender Base 247 Series Qty 1 Insert Wiper Crescendo Espresso Brewer Qty 1 Kit Tube Silicone 6mm ID x 9mm OD...

Страница 27: ...ll to Strength Adjust menu Enter and scroll to Test LG Grind Time menu Place cup under grinder chute to catch coffee grounds during grind adjustment Press the espresso button to start the grinder disp...

Страница 28: ...clockwise to desired particle size use screwdriver to hold adjustment screw while tightening lock nut CAU TION If there is ground coffee in the grinder this adjustment should only be made while the g...

Страница 29: ...and press any beverage dispense button 8 Grinder will run for the time set for a small single shot espresso then stop 9 Repeat several times and average the weight 10 To change the weight press the S...

Страница 30: ...om the power source and water supply 11 Let the water in the soluble tank cool before draining 12 Remove left side panel 13 Pull the drain tube out of the dispenser and direct it into a drain or a con...

Страница 31: ...for P N 54323 0000 Revision B Version 01 Drawn KJO Date 09 10 18 Colors Black 54323 0000 B 08 24 2018 BUNN O Matic Corporation 1 5 10 10 1 5 15 1 4 1 10 5 1 1 4 1 V V V V GND N L2 L1 PS 1 POWER SUPPL...

Страница 32: ...sion 00 Drawn KJO Date 08 24 18 Colors Black 0001 A 08 24 2018 BUNN O Matic Corporation ELECTRICAL SCHEMATIC 1 5 10 10 1 5 15 1 4 1 10 5 1 1 4 1 V V V V GND N L2 L1 PS 1 POWER SUPPLY 24VDC 150 WATTS R...

Отзывы: