Bunn Crescendo Series Скачать руководство пользователя страница 27

27

042319

ADJUSTMENTS

Adjustable Variables Used to Create A Perfect Shot of Espresso Topped with Crema

:

The primary 2 variables that you mostly will adjust to achieve your ideal double shot espresso pour time will 

be the coffee particle size and the dosage targets.

Variables

1.  Coffee Particle Size: Adjustable
2.  Espresso & Water Dosage: Adjustable (Target 12 grams espresso, 60 ML water for double shot)
3.  Dry Tamp Percentage: Factory Default Setting 60 - Adjustable 60-100
4.  Espresso Water Temperature: Factory Default Setting 215° F. Adjustable 190°-218°

Brew/Pour Time Target

  • 17-23 Seconds Brew Time for Double Shot Espresso
Once the double shot has been calibrated, the grinder coarseness adjustment is complete. The only  

adjustment you will need to perform is setting the espresso & water dosage for a single shot espresso.

Single Shot

: 7 grams espresso, 30 ML water

NOTE:

 The brew/pour time will be what it is once the single shot dosage parameters are set.

Procedure Setting the Coffee Grinder Grind Setting

Do Not

 change the grind particle size significantly, change coffee coarseness in 1 click (knob) or 1 hashmark 

(adjustment screw with lock nut) increments, as it will change the grind rate, thus the amount of coffee 

ground and brew/pour time.

Step 1

: First, ensure espresso beans are in the hopper. Open the door, and slide the espresso brew group 

lock to the left to unlock the brew group. Tip the top of the brew group head towards the front of the machine 

to disengage from the espresso drive, then remove brew group from the drive.

Step 2

: Enter program mode and scroll to “Strength Adjust” menu. Enter and scroll to “Test LG Grind Time” 

menu. Place cup under grinder chute to catch coffee grounds during grind adjustment. Press the espresso 

button to start the grinder dispense timer, adjust the grinder adjustment screw while the grinder is operating 

until grind particle size is desired or matches a desired grind sample.

Step 3

: After setting the grind particle size, tare cup on weigh scale and then place cup under grinder chute 

and press the espresso button to start the grinder dispense timer, weigh the dispensed grounds. The target is 

12 grams for a double shot espresso. Adjust the grind time and keep repeating the grind throw test until 12 

grams is achieved.

Step 4

: Next, enter program mode and scroll to “Set Espresso Shots” menu. Select menu and scroll thru sub 

menus until “LG Brew Volume” is displayed. Ensure the tic number is set at 190/default.

NOTE

: 3.0 tics = 1.0 mil, Default 190 tics divide by 3.0 = 63.33 mils. This is your brew volume target 

63.33mils for a double shot. The extra 3.33 mils most likely will be absorbed in the espresso puck resulting 

around 60 mils of finished product/double shot. 

Step 5

: Reinstall the brew group, return switch to the “Normal” position and close door. Make a large  

espresso to see if your brew/pour time is within the 17-23 seconds. 

 

NOTE: 

Anytime you make an adjustment to the coffee coarseness and grind time, a shot must be discarded 

between adjustments. If the pour is too slow or too fast, repeat all steps until you are within the 17-23  

seconds brew time.

NOTE

: Steps 1 thru 3 will take some back and forth adjustments to achieve the target brew time. You should 

end up with a dark color espresso, topped with a tan colored foam called crema. The crema may also have a 

marble like appearance.

Содержание Crescendo Series

Страница 1: ...tely FREE and the quickest way to obtain the latest catalog and manual updates For Technical Service contact Bunn O Matic Corporation at 1 800 286 6070 52384 0001 D 04 19 2016 Bunn O Matic Corporation...

Страница 2: ...ons to this warranty or to make additional warranties that are binding on BUNN Accordingly statements by such individuals whether oral or written do not constitute warranties and should not be relied...

Страница 3: ...0 Operating Controls and Interface 11 Creating Custom Beverage 12 Through Counter Option 16 General Cleaning 17 Preventive Maintenance 25 Adjustments 26 Door Safety Interlock 30 Wiring Schematic 31 Ti...

Страница 4: ...w national local electrical codes Do not use near combustibles Do not deform plug or cord To reduce the risk of electric shock do not remove or open cover No user serviceable parts inside Authorized s...

Страница 5: ...o be used in applications such as farm houses Access to the service areas permitted by Authorized Service personnel only The A Weighted sound pressure level is below 70 dBA NORTH AMERICAN REQUIREMENTS...

Страница 6: ...tray into the opening in the lower front of the machine 2 Remove the espresso brew group from the parts box 3 Slide tube onto elbow fitting on upper left side of espresso group head as shown in Figur...

Страница 7: ...Figure 3 P4377 7 Slide red lock to the right until it snaps into place as shown in Figure 4 Figure 4 P4378 8 Install group head tube into quick connect fitting on bottom of espresso drive insuring tha...

Страница 8: ...t the dispenser to the power source 4 If plumbing is to be hooked up later be sure the dispenser is disconnected from the power source If plumbing has been hooked up the dispenser is ready for Initial...

Страница 9: ...event that a message appears fill time too long powder cycle to clear the message 3 The screen on the front door will display FILL ESPRSO TANK Press the button under START 4 The screen will display M...

Страница 10: ...r hoppers by lifting the front of the powder hopper until the peg on the bottom of the hopper clears the hole in the mounting plate see Figure 1 Then pull the hopper forward to remove 3 Set the hopper...

Страница 11: ...quence OPERATING THE DISPENSER The NORMAL PROGRAM RINSE switch must be in the NORMAL position 1 Place a cup on the drip tray beneath the dispense nozzle 2 In the area marked 1 of the control panel a M...

Страница 12: ...placed with one which matches the beverage reassignments made in this mode All settings can be adjusted to preference Set Espresso Shots The sub menus for adjusting an espresso shot are located under...

Страница 13: ...ub menus for adjusting recipes are located under this option Set the toggle switch to Program mode STEP 1 Advance to the RECIPE SETUP screen STEP 2 PROGRAM MODE PRESS TO ENTER Press SELECT STEP 3 1 SE...

Страница 14: ...n Cannot choose NONE Navigate to the next setting STEP 10 1st POWDER DIL HPR RIGHT 1 SELECT SIZE Use to Navigate Sets the amount of product used for the recipe that comes from the hopper If a hopper i...

Страница 15: ...t setting STEP 4 SM ESP GRIND TIME sec 1 SELECT SIZE Use to Navigate Use to decrease Use to increase Press a dispense switch to perform a catch test for a small grind Navigate to the next setting STEP...

Страница 16: ...e the cover 5 Used coffee puck will now fall through the opening in the chassis 6 Position the Crescendo so that the opening in the bottom of the machine coincides with the hole in the countertop 7 To...

Страница 17: ...main screen 5 Place the NORMAL PROGRAM RINSE switch to the NORMAL position To place the unit in the ENERGY SAVER mode 1 Open the door and place the NORMAL PROGRAM RINSE switch in the RINSE position 2...

Страница 18: ...panel door and cabinet with a clean damp cloth WEEKLY PARTS WASHING 1 Remove the elbows and slide gates from all hoppers Disconnect the elbows from the outlets of both mixing chambers 2 Remove the po...

Страница 19: ...ando RUN PROGRAM RINSE en la posici n de lavado RINSE y apretar el bot n bajo RINSE Luego aprete cualquier bot n dispensador de bebida 2 Empuje la compuerta deslizante frente a los codos de la tolva h...

Страница 20: ...ve Head Cake Pusher with lukewarm water only paying special attention to the channels 4 Insert cleaning brush into each side of the brewer housing and under lukewarm water turn the cogs 2 Remove Sieve...

Страница 21: ...assemble the brewer making sure the gear wheels are aligned open for sieve head insertion 6 Re attach the water inlet hose and place the brewer back in the drive unit 7 Reconnect outlet hose slide the...

Страница 22: ...under the dispense nozzles 3 Press the button under RINSE on the screen 4 Press any beverage selection button 5 The dispenser will automatically run hot water through both soluble mixing chambers and...

Страница 23: ...CYCLE WEEKLY 1 Open the door and place the NORMAL PROGRAM RINSE switch in the RINSE position 2 Press the button under CLEAN on the screen 3 When the screen prompts ADD CLEANING TABLET open the dispen...

Страница 24: ...under NEXT 6 When screen displays PRESS DISPENSE TO START press any beverage dispense button to begin cleaning cycle 7 During the cleaning cycle the screen with display CLEANING CYCLE IN PROGRESS PRES...

Страница 25: ...er counter clock wise and remover from shaft by pulling straight out NOTE Ensure O ring and shaft seal are in place during re assembly Remove right frother disk from shaft by pulling straight out Remo...

Страница 26: ...0000 Qty 2 Impeller 4mm Qty 2 O ring 1 48 ID Blender Base 247 Series Qty 2 Gasket Silicone Blender Base 247 Series Qty 1 Insert Wiper Crescendo Espresso Brewer Qty 1 Kit Tube Silicone 6mm ID x 9mm OD...

Страница 27: ...ll to Strength Adjust menu Enter and scroll to Test LG Grind Time menu Place cup under grinder chute to catch coffee grounds during grind adjustment Press the espresso button to start the grinder disp...

Страница 28: ...clockwise to desired particle size use screwdriver to hold adjustment screw while tightening lock nut CAU TION If there is ground coffee in the grinder this adjustment should only be made while the g...

Страница 29: ...and press any beverage dispense button 8 Grinder will run for the time set for a small single shot espresso then stop 9 Repeat several times and average the weight 10 To change the weight press the S...

Страница 30: ...om the power source and water supply 11 Let the water in the soluble tank cool before draining 12 Remove left side panel 13 Pull the drain tube out of the dispenser and direct it into a drain or a con...

Страница 31: ...for P N 54323 0000 Revision B Version 01 Drawn KJO Date 09 10 18 Colors Black 54323 0000 B 08 24 2018 BUNN O Matic Corporation 1 5 10 10 1 5 15 1 4 1 10 5 1 1 4 1 V V V V GND N L2 L1 PS 1 POWER SUPPL...

Страница 32: ...sion 00 Drawn KJO Date 08 24 18 Colors Black 0001 A 08 24 2018 BUNN O Matic Corporation ELECTRICAL SCHEMATIC 1 5 10 10 1 5 15 1 4 1 10 5 1 1 4 1 V V V V GND N L2 L1 PS 1 POWER SUPPLY 24VDC 150 WATTS R...

Отзывы: