7
9.
Align the auger shaft with the
flat fin of the auger. Push the
augers as far as they will go and
rotate them so the flat fins are
pointing up.
10.
Thoroughly rinse the hoppers
and install them over the cool-
ing drums with augers. Slide
them into place and
push them
down as far as they will go.
As much as possible, keep lu-
bricant from the inside of the
hoppers. The cleaner you keep
the food zone, the cleaner the
product you’ll serve the cus-
tomer.
11.
Set the lids on the hoppers.
Slide front-to-back or lift off for
filling.
12.
Plug in the hopper lid lamp
cables.
13.
(CDS-2 only) Assemble the drip
tray.
14.
(CDS-3 only) Loosen the two
front legs by turning counter-
clockwise to gain approxi-
mately .25" clearance. Install
the slots of the support bracket
over threaded studs of the legs
as shown in illustration. Tighten
the legs by turning clockwise to
secure the bracket in place.
APPROXIMATELY .25"
15.
(CDS-3 only) Install the drip
tray.
INITIAL SETUP (CONT.)
27646 022500
Содержание CDS-2
Страница 51: ...51 COOLANT SCHEMATIC DIAGRAM CDS 2 27646 022500 ...
Страница 54: ...54 27646 022500 ...
Страница 55: ...55 27646 022500 ...
Страница 56: ...56 27646 022500 ...
Страница 58: ...58 27646 022500 ...
Страница 59: ...59 27646 022500 ...
Страница 60: ...60 27646 022500 ...