Manual-SMT 3000 ECO LIGHT Plus-en
page 9 / 18
Installation
The manipulator is delivered assembled. You only need to connect pump to power and vacuum tube and to
connect the camera and the monitor.
Operating conditions:
Operating temperature: 15 - 30 C °
Humidity: 50 – 75%
Connect the manipulator
Now connect the vacuum hose of the placement arm to the vacuum pump. Activate the pump with the
power cable.
Now attach one of the supplied pipettes to the manipulator head and test by holding the selected hole to see
whether there is negative pressure on the pipette.
Mount the monitor and connect it to the power supply. The 2nd power supply is for the camera. Please also
connect. Finally connect the cinch cable to the monitor and set the source to AV1 in the monitor menu.
Caution
When setting up the manipulator, make sure that it is level and secure on the workplace.
Otherwise the functionality could be restricted.
Vacuum drilling
The head of the SMT 3000 ECO is provided with two drill holes, which serve to create the required vacuum.
Vacuum is created by closing the opening with a finger. The user can individually determine which one is bet-
ter to use. One is on the top of the head and one is on the side. The unused is closed with the grub screw.
Bungard Elektronik GmbH & Co. KG, Rilkestraße 1, 51570 Windeck – Germany
Tel.: +49 (0) 2292/9 28 28 - 0, Fax: +49 (0) 2292/9 28 28 - 29, E-mail: [email protected]