Servicing the VGA Kit
3
3. From the front of the cabinet, release the two captive screws securing the server drawer
to the cabinet rack (
A
).
Figure 3.
Server drawer rack fixture screws
4. Slowly pull the server drawer forward until the rails are fully extended and locked, taking
care not to snag or loosen connected cables.
Figure 4.
Server drawer in the servicing position
Содержание NovaScale 9006
Страница 1: ...NovaScale 9006 Server VGA Kit Service Sheet NOVASCALE REFERENCE 86 A7 82FB 00 September 2009...
Страница 28: ......