Servicing the VGA Kit
21
22. Return the Server Drawer to the Operating Position.
1. From the front of the cabinet, raise the two thumb levers on the rail assemblies.
2. Push the server drawer fully backward until it is flush with the cabinet rack.
3. Tighten the two captive screws (A) securing the server drawer to the cabinet rack
.
Figure 33. Server drawer front view
Содержание NovaScale 9006
Страница 1: ...NovaScale 9006 Server VGA Kit Service Sheet NOVASCALE REFERENCE 86 A7 82FB 00 September 2009...
Страница 28: ......