2
Product Name - Manual Type
Procedure
1. Unpack the new component on a clean ESD-protected work surface.
2. Open the cabinet front door.
3. Power down the server drawer.
4. Open the cabinet rear door.
5. Disconnect the related cables (rear).
6. Place the Server Drawer in the Servicing Position.
1. From the rear of the cabinet, check that all cables connected to the server drawer are
clearly labeled at both ends. Label any cables that lack identification.
2. Extend the two red cable hanger stop pins and turn 90° to lock them into position.
Figure 2.
Extending cable hanger stop pins
Содержание NovaScale 9006
Страница 1: ...NovaScale 9006 Server VGA Kit Service Sheet NOVASCALE REFERENCE 86 A7 82FB 00 September 2009...
Страница 28: ......