Büchi Labortechnik AG
Installation | 5
Operation Manual Rotavapor® R-250 Pro
29/78
5.5
Installing the vacuum supply
5.5.1
Installing the vacuum pump holder (option)
u
Hold the vacuum pump holder at the indicated
position and fix it with the side screws.
u
Attach the rear screws.
5.5.2
Installing a BUCHI vacuum pump (option)
Precondition:
R
The BUCHI vacuum pump is prepared. See
related documentation
u
If possible, locate the vacuum pump at the
vacuum pump location of the instrument. See
Chapter 3.2 "Configuration", page 13
u
Attach the vacuum hose to the Aeration valve.
u
Connect the vacuum pump cable to the related
connection on the instrument. See Chapter 3.2
"Configuration", page 13
u
Connect the vacuum pump power supply cable
to the related connection on the instrument.
See Chapter 3.2 "Configuration", page 13
u
Connect the aeration valve cable to the related
connection on the instrument. See Chapter 3.2
"Configuration", page 13