Büchi Labortechnik AG
Installation | 5
Operation Manual Rotavapor® R-250 Pro
27/78
5.4.6
Installing the double receiver
Installation order:
4
1
3
2
9
5
6
7
8
10
Fig. 8: Installation order double receiver
1
See Chapter "Assembling instruction
receiving vessel support", page 24
2
See Chapter "Assembling instruction
receiving vessel support", page 24
3
See Chapter "Assembling instruction
EasyClamp DN25", page 22
4
See Chapter "Assembling instruction
EasyClamp DN25", page 22
5
See Chapter "Assembling instruction
shut off tap", page 24
6
See Chapter "Assembling instruction
EasyClamp DN25", page 22
7
See Chapter "Assembling instruction
EasyClamp DN25", page 22
8
See Chapter "Assembling instruction
shut off tap", page 24
9
See Chapter "Assembling instruction
EasyClamp DN25", page 22