Büchi Labortechnik AG
Product description | 3
Operation Manual K-365 Kjel Line
27/106
Component
Materials of construction
Plastic splash protector
Glass fiber reinforced polypropylene
Protective cover
PMMA
Sealing
CSM
NaOH hose
EPDM
Three-way valve
PP / PE
3.5.4
Installation site
The installation site meets the safety requirements. See Chapter 2 "Safety",
page 10
The installation site has a firm, level and nonslip surface.
The installation site has no obstacles (e.g. water taps, drains, etc.).
The installation site has enough space that the canisters can be placed safely.
The installation site has an own mains outlet socket for the instrument.
The installation site allows that the power supply can be disconnected at any time
in an emergency.
The installation site is not exposed to external thermal loads, such as direct solar
radiation.
The installation site has enough space that cables / tubes can be routed safely.
The installation site meets the requirements for the connected devices. See
related documentation
The installation site meets the specifications according to the technical data (e.g.
weight, dimension, etc.). See Chapter 3.5 "Technical data", page 24