![BTCPower EVSE 200 KW Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/btcpower/evse-200-kw/evse-200-kw_installation-and-user-manual_2824943013.webp)
This document is the
Property of Broadband Telecom Power Inc.
and
will not be copied, reproduced, or used as the basis for sale or
manufacture of apparatus without written permission.
BTCPower 200 KW EVSE Installation manual
Rev K
Page 13 of 26
Fig. 1 AC input terminal lugs.
DC Converter - Output terminal block (from converter to dispenser – single and dual high
output configuration):
From power stages
Wire range
Openings per pole (terminal lug)
Terminal Lug PN
Torque requirement
350 KCMIL (4/0
AWG)
–
6 AWG
2
2-350L2
375 IN-LB
L1, L2, L3 Terminal
lug connections.