Manual PRO v.3
56 / 78
b.
Chlorine Menu -
> Select “calibra
tio
n” and press OK. Wait until
the reading is stable:
c.
Adjust the real value obtained by means of DPD-1 test.
d.
Return to the main screen. The current CL value will match
with the value obtained from DPD-1 test.
3.2.2.3.5 Probe maintenance
Please, carefully read the following maintenance instructions for your PRO/2 Kit.
The maintenance periods are illustrative, they are depending on factors such
as the quality of the water and the installation maintenance, especially with
the filtration system.
Weekly Maintenance:
Analyze the water from your swimming pool and if
necessary, calibrate the free chlorine probe as shown on the 3.4 chapter.
Twice a year (depending on the installation):
Replace the electrolyte.
Once a year:
Replace the header (membrane).
How to replace the electrolyte and the header.
1)
Remove the probe from the probe holder
2)
Unscrew the header and remove the old electrolyte. Handle it carefully to
avoid damaging the membrane.
3)
Clean the Sharp point of the probe using the supplied abrasive paper.
Please do it carefully, without an excessive pressure.