5. Connect the positive (+) test lead to Wire 23 at the
terminal strip in the transfer switch.
a. If voltage is present, proceed to Step 6.
b. If voltage is not present, repair wiring between
terminal strip and transfer relay (TR).
6. Connect the negative (-) test lead to the ground lug in
the generator control panel. Connect the positive (+)
test lead to Wire 23 in the generator control panel at the
interconnection terminals (ICT) or at the terminal strip.
a. If voltage is present, proceed to Step 7.
b. If voltage is not present, repair wiring between
transfer switch and generator control panel.
7. Connect the positive (+) test lead to Wire 23 located in
the J1 connector Pin Location 3, connected to the circuit
board (see Figure 3, Section 4.1).
a. If voltage is present, proceed to Step 8.
b. If voltage is not present, repair wiring between
(ICT and J1connector).
8. Turn off utility power to transfer switch, simulating a
utility failure.
a. Generator starts and transfer occurs,
discontinue tests.
b. Generator starts and transfer does not occur.
With the generator running and utility off, ground
Wire 23 in the control panel at interconnection
terminals (ICT) or at the terminal strip. If
transfer occurs replace circuit board.
9. Connect the negative (-) test lead to the ground lug in
the generator control panel. Connect the positive (+)
test lead to Wire 194 in the generator control panel at
the interconnection terminals (ICT) or at the terminal
strip.
a. If the voltage is present, repair wiring between
ICT (or terminal strip) and transfer switch
b. If voltage is not present, proceed to Step 10.
10.Connect the positive (+) test lead to Wire 194 located in
the J1 connector Pin Location 4, connected to the circuit
board (see Figure 3, Section 4.1).
a. If voltage is present, repair wiring between J1
connector and ICT (or terminal strip).
b. If voltage is not present, replace circuit board.
TEST 27- CHECK VOLTAGE AT TERMINAL
LUGS N1, N2
DISCUSSION:
If retransfer to the "Utility" power source side is to
occur, utility source voltage must be available to
terminal lugs N1 and N2 of the transfer mechanism.
In addition, If that source voltage is not available to
NI/N2 terminals, automatic startup and transfer to
"Standby" will occur when the generator manual-off-
auto switch is set to AUTO. This test will prove that
"Utility" voltage is available to those terminals, or is
not available. It is the first test in a series of tests that
should be accomplished when (a) retransfer back to
'Utility" does not occur, or (b) startup and transfer
occurs unnecessarily.
DANGER: PROCEED WITH CAUTION! HIGH
AND DANGEROUS VOLTAGES ARE
PRESENT AT TERMINAL LUGS N1/N2.
CONTACT WITH HIGH VOLTAGE TERMINALS
WILL RESULT IN DANGEROUS AND
POSSIBLY LETHAL ELECTRICAL SHOCK. DO
NOT ATTEMPT THIS TEST WHILE STANDING
ON WET OR DAMP GROUND, WHILE
BAREFOOT, OR WHILE HANDS OR FEET
ARE WET.
PROCEDURE:
1. Make sure that all main line circuit breakers in the utility
line to the transfer switch are “On” or “Closed.”
2. Test for utility source line-to-line voltage across terminal
lugs N1 and N2 (see Figure 1). Normal utility source
voltage should be indicated.
RESULTS:
1. If low or no voltage is indicated, find the cause of the
problem and correct.
2. If normal utility source voltage is indicated, go on to Test
28.
3. For Problem 14 ONLY, if voltage is good, repair or
replace Wire N1A/N2A between Transfer Switch Lugs
N1/N2 and Fuse Holder connections.
TEST 28 - CHECK VOLTAGE AT UTILITY 1 AND
UTILITY 2 TERMINALS
The Utility 1 and Utility 2 terminals in the transfer
switch deliver utility voltage “sensing” to a circuit
board. If voltage at the terminals is zero or low,
standby generator startup and transfer to the
“Standby” source will occur automatically as
controlled by the circuit board. A zero or low voltage
at these terminals will also prevent retransfer back to
the “Utility” source.
PROCEDURE:
With utility source voltage available to terminal lugs
N1 and N2, use an AC voltmeter or a VOM to test for
utility source line-to-line voltage across terminal block
“V-TYPE” PREPACKAGED
TRANSFER SWITCHES
PART 3
Содержание ASPAS1BBA007
Страница 4: ...Page 4 SPECIFICATIONS MOUNTING DIMENSIONS...
Страница 5: ...Page 5 SPECIFICATIONS MOUNTING DIMENSIONS...
Страница 24: ...Page 24 NOTES PART 1 GENERAL INFORMATION...
Страница 32: ...Page 32 SECTION 2 3 TROUBLESHOOTING FLOWCHARTS PART 2 AC GENERATORS...
Страница 33: ...Page 33 SECTION 2 3 TROUBLESHOOTING FLOWCHARTS AC GENERATORS PART 2...
Страница 34: ...Page 34 SECTION 2 3 TROUBLESHOOTING FLOWCHARTS PART 2 AC GENERATORS...
Страница 60: ...Page 60 SECTION 3 3 TROUBLESHOOTING FLOW CHARTS PART 3 V TYPE PREPACKAGED TRANSFER SWITCHES...
Страница 70: ...Page 70 SECTION 3 4 DIAGNOSTIC TESTS PART 3 V TYPE PREPACKAGED TRANSFER SWITCHES...
Страница 90: ...Page 90 SECTION 4 3 TROUBLESHOOTING FLOW CHARTS PART 4 DC CONTROL...
Страница 91: ...Page 91 SECTION 4 3 TROUBLESHOOTING FLOW CHARTS DC CONTROL PART 4...
Страница 92: ...Page 92 SECTION 4 3 TROUBLESHOOTING FLOW CHARTS PART 4 DC CONTROL...
Страница 93: ...Page 93 SECTION 4 3 TROUBLESHOOTING FLOW CHARTS DC CONTROL PART 4...
Страница 94: ...Page 94 SECTION 4 3 TROUBLESHOOTING FLOW CHARTS PART 4 DC CONTROL...
Страница 95: ...Page 95 SECTION 4 3 TROUBLESHOOTING FLOW CHARTS DC CONTROL PART 4...
Страница 138: ...PART 7 ELECTRICAL DATA WIRING DIAGRAM 8 CIRCUIT LOAD CENTER Page 138 DRAWING 0E7687A...
Страница 140: ...Page 140 DRAWING 07687 PART 7 ELECTRICAL DATA WIRING DIAGRAM 10 12 CIRCUIT LOAD CENTER...
Страница 142: ...Page 142 PART 7 ELECTRICAL DATA NOTES...
Страница 144: ...Part No 0F4676 Revision 02 25 05 Printed in U S A Catalog No DMASPAS 07 1...