![Bryan Boilers FF1000 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/bryan-boilers/ff1000/ff1000_installation-and-operation-manual_2821783004.webp)
Form: 2435
Revision: 9
Free Flex Installation and Operation Manual
Date: 9-1-2017
Bryan Steam LLC, 783 N Chili Ave, Peru IN 46970
Web:
www.
bryanboilers
.com
Phone:
765-473-6651
Fax:
765-473-3074
Email:
iv
Appendix F.1 Single Boiler, Primary / Secondary ............................................................................................... 56
Appendix F.2 Multiple Boilers, Primary Reverse-Return Piping ................................................................... 57
Appendix F.3 Multiple Boilers, Primary / Secondary Reverse Return Piping ......................................... 58
Appendix F.4 Multiple Boilers, Primary / Secondary Piping .......................................................................... 59
Appendix F.5 Multiple Boilers, Primary / Secondary Piping, Heating with Domestic Hot Water ... 60
Appendix F.6 Multiple Boilers, Primary / Secondary Piping, Heating with Domestic Hot Water
(continued) .......................................................................................................................................................................... 61
Appendix G Water Flow Pressure Drops ..................................................................................................................... 62
Appendix H Wiring Diagrams ........................................................................................................................................... 63
Appendix H.1 FF1000 Wiring Diagram .................................................................................................................... 63
Appendix H.2 FF1500 To FF3000 115 VAC Single Phase Wiring Diagram ............................................... 65
Appendix H.3 FF1500 To FF3000 208 – 230 VAC Single Phase Wiring Diagram .................................. 66
Appendix H.4 FF2000 To FF3000 208-460 VAC Three Phase Wiring Diagram...................................... 68
Appendix I Repair Parts ...................................................................................................................................................... 70
Appendix I.1 FF1000 Heat Exchanger ...................................................................................................................... 70
Appendix I.2 FF1000 Burner Assembly ................................................................................................................... 72
Appendix I.3 Gas Train and Upper Vestibule Controls ...................................................................................... 73
Appendix I.4 Jacket ........................................................................................................................................................... 75
Appendix I.5 Outlet Manifold ....................................................................................................................................... 77
Appendix I.6 Miscellaneous External Components ............................................................................................. 79
Appendix I.7 Controls ...................................................................................................................................................... 81
Tables
Table 1Water Flow Switch Settings ................................................................................................................. 8
Table 2: Clearances and Serviceability .......................................................................................................... 11
Table 3: Typical Condensate Flow Rate ....................................................................................................... 13
Table 4: Combustion Air and Flue Gas Requirements .............................................................................. 19
Table 5: Electrical Requirements ................................................................................................................... 23
Table 6: Gas Supply Requirements ............................................................................................................... 24
Table 7 Sound Pressure Levels ...................................................................................................................... 24
Table 8 Minimum Water Flow Rates for Variable Primary Pumping ...................................................... 25
Table 9 Maximum Water Flow Rates for Variable Primary Pumping ..................................................... 25
Table 10 Water Flow Rates for Primary / Secondary Pumping 20F
Δ
T ................................................ 26
Table 11 Water Flow Rates for Primary / Secondary Pumping 40F
Δ
T ................................................ 26
Table 12 GPM Increase for Glycol Systems ................................................................................................ 27
Table 13: Chemical Agents and Effects ........................................................................................................ 29
Table 14 Recommended Feed Water Limits ............................................................................................... 30
Table 15: Safety Device Test .......................................................................................................................... 35
Table 16: Safety and Operating Controls ..................................................................................................... 44
Table 17: General Troubleshooting .............................................................................................................. 45
Table 18: Maximum Gas Capacity Of Schedule 40 Pipe ........................................................................... 48
Table 19: Equivalent Lengths Of Standard Pipe Fittings And Valves ..................................................... 49
Table 20: Specific Gravity Correction Factors ............................................................................................ 49
Table 21: Heat Exchanger Parts .................................................................................................................... 71
Table 22: Burner Assembly ............................................................................................................................ 72
Table 23: Gas Train and Upper Vestibule Controls ................................................................................... 74
Table 24: Jacket ................................................................................................................................................ 76